介绍了电力技术改造项目的经济效益指标,并利用模糊综合评判方法,构建了多指标评价体系。
This paper introduces the economic benefit indexes of power technology reform project, and by using fuzzy comprehensive evaluation, establishes the evaluation system with multiple indexes.
介绍了电力技术改造项目的经济效益指标,并利用模糊综合评判方法,构建了多指标评价体系。
This paper introduces the economic benefit indexes of power technology reform project, and by using fuzzy comprehensive evaluation, establishes the evaluation system with multiple indexes.
应用推荐