• 9示为一个简单屋顶承梁组成木板,再铺油毡防水。

    FIG. 9 illustrates a simple flat roof, consisting of timber bearers covered with timber boarding and finished with several layers of tar felt.

    youdao

  • 无论是结构还是混凝土结构,空心箱型结构承梁桥墩桁架式结构好。

    Hollow box structures for both the deck and piers, whether of steel or concrete, are better than steel trussed structures.

    youdao

  • 目前可供选择方案国外使用较多的驮式运管是底运管车。

    There are two schemes to be chosen, one is transport vehicle with packing beam, which is very popular worldwide, the other is the transport vehicle.

    youdao

  • 王艳丽,张云龙,费以原钢筋混凝土井式屋面荷载楼面结构多有出现

    Derrick-type reinforced concrete beam often appears in the framework of house walls and building walls that don't support the weight of walls, boards and so on.

    youdao

  • 目前,吊车荷载作用工字腹板局部屈曲鲜有研究,这主要是由于无法得到轮压荷载作用下应力腹板内的分布规律。

    The local buckling of web plates in I-girders under wheel loading has been rarely investigated, due to the unknown distribution of bearing stresses in the web plates.

    youdao

  • 基础采用分离式台钻孔桩基础,两台设横连接,系预应力混凝土结构。

    The foundation of the pylon is composed of bored piles and separate pile caps connected with prestressed concrete tie beams.

    youdao

  • 古城大桥座下钢管混凝土系杆截面连续组合体系

    Gucheng bridge is a steel tube concrete bowstring arch and variable cross section continuous beam composite system through bridge with single load plate.

    youdao

  • 通过既有线铁路提速试验,分析了钢板横向刚度要求,提出合理的加固方案

    To analyse the demand of transverse rigidity and the strengthening scheme of deck plate girder according to the raising speed experiment of the existing track.

    youdao

  • 磨损严重难以调整设计时,只需更换击砧而不必更换质量

    When worn anvil bearing strike, difficult to adjust to the design value, only need to change when bearing strike without replacing large quality anvil bearing strike beam.

    youdao

  • 计算UPPC(板)抗弯强度关键确定构件极限裁能力无粘结预应力筋的极限应力

    The key of calculating flexure strength of UPPC beam is to determine unbounded prestressed tendons ultimate value when the components are under their ultimate load ability.

    youdao

  • 以水下浇筑大桥采用挂篮施工多跨连续结构浙江富阳大桥工程重头戏。

    Underwater placement of bridge's platform and cradle construction method for multi-span continuous box-girder structure constitute the construction feature of Fuyang bridge in Zhejiang province.

    youdao

  • 海淀公园人行天桥位于北京海淀公园内,其钢-混凝土组合连续双线双曲下

    The pedestrian overbridge of Haidian Park is located in Beijing Haidian Park, whose steel-concrete continous beam is a bifilar and hyperbolic through box beam.

    youdao

  • 设计制作一个4节间下结合模型

    A through truss composite beam model with 4 panels is designed and made.

    youdao

  • 桥墩台、柱式墩身组成桥墩重要组成部分

    Column pier is made up of pile cap, pier body and cap beam, pier column is an important part of the pier.

    youdao

  • 3个阶段10种荷载工况进行模型力学性能试验研究式钢结合受力性能。

    The mechanical property test of the model covering 3 stages under 10 load conditions is carried out to study the loading property of through truss composite beam with simple support.

    youdao

  • 通过工程实例剖析,介绍注浆扩大台()法等桩基事故处理方法原理,作为工程实践经验的总结。

    Through the analysis of pile bottom grouting and beam expanding accident methods and principles, the engineering practical examples are summarized.

    youdao

  • 介绍了对T型钢轨偏轨形主焊接变形控制

    Controlling for distortion of main box girder carrier-track welded with T-beam is introduced in the paper.

    youdao

  • 施加格子结构可调动坡面更大范围岩土发挥自能力分担锚索担的部分荷载改善边坡稳定性

    Sash Girder structures placed on slope face can induce self bearing capacity of soil, share partial load carried by anchor group and improve slope stability.

    youdao

  • 楼层结构由框架楼层以及边模板等组成

    Mezzanine structure is make up of steel column, floor beam, meal deck, etc.

    youdao

  • 桥墩台、柱式墩身组成,柱和桩基重要组成部分

    Column pier comprised pile cap, pier body and cap beam, pier column and pile found is as an important part of the bridge.

    youdao

  • 对于式钢箱系杆拱桥来说,主结构设计关键部位

    The steel-box girder of the tie-bar arch-bridge is the key part in the structural design.

    youdao

  • 考虑地下室基础布置情况下,基础弯矩计算进行分析推导,得出了跨中弯矩折减系数计算公式。

    Moments on basement foundation beams considering rigid zone of pile caps and pulling resistance of piles are analyzed. Reduction factor of midspan moment is gained.

    youdao

  • 环行起重机环形轨道连接方法涉及核电站用环行起重机。

    The invention discloses a method for connecting a circular track with a bearing-rail beam of a polar crane, relating to a polar crane for a nuclear power station.

    youdao

  • 环行起重机环形轨道连接方法涉及核电站用环行起重机。

    The invention discloses a method for connecting a circular track with a bearing-rail beam of a polar crane, relating to a polar crane for a nuclear power station.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定