承包商应自费编制此类建议书,并将其包括在第13.3款【变更程序】所列的条目中。
The proposal shall be prepared at the cost of the Contractor and shall include the items listed in Sub-Clause 13.3 [Variation Procedure].
第三次出现轻度工伤事故,EHS部门写出建议书,建议与该承包商终止合同并取消其预审格。
The third time of injury, EHS section will give responsible for the item advice to terminate the contract, and cancel the pre-qualification of the contractor.
第四次出现违反安全制度的行为,EHS部门写出承包商终止合同建议书,并取消其预审资格。
The fourth time of violate the regulations, EHS section will give responsible for the item advice to terminate the contract, and cancel the pre-qualification of the contractor.
在颁发工程接收证书前的任何时间,工程师可通过发布指示或以要求承包商递交建议书的方式,提出变更。
Variations may be initiated by the Engineer at any time prior to issuing the Taking-Over Certificate for the Works, either by an instruction or by a request for the Contractor to submit a proposal.
在颁发工程接收证书前的任何时间,工程师可通过发布指示或以要求承包商递交建议书的方式,提出变更。
Variations may be initiated by the Engineer at any time prior to issuing the Taking-Over Certificate for the Works, either by an instruction or by a request for the Contractor to submit a proposal.