提出了哈尔滨市计生委办公楼结构改造所需的托换梁、托换柱、托换基础及相关连接构造的设计思路和方法。
Design thought and method of underpinning beam, column, foundation and relative joint construction in remodeling office building for Committee of Family Planning in Harbin are introduced.
本文介绍了采用基础托换与柱基顶升复位施工的程序和做法。
This paper introduces the construction program and practicing method of the foundation underpinning and column foundation jacking restoration.
结合工程实例,介绍静压预制短桩在既有建筑基础托换中的应用技术。
The article presents a practical engineering example, introducing the application technology of prefabricated short silent piling in foundation underpinning.
通过对某一建筑湿陷事故的处理,分析了石灰桩基础托换技术在处理地基湿陷事故中的机理及效果。
By the collapse accident treatment on a building, the treatment principle and effect of lime pile underpinning is analysed.
因此,探讨研究黄土地区既有事故建筑物基础托换技术是当今工业生产和土木工程建设所面临的重大课题之一。
Therefore, studying on underpinning technology of existing buildings in loess region is the major issue which today's industrial production and civil engineering should face.
利用微型钢管桩进行基础托换是既有建筑物地下增层改造的有效方法。
Steel tubular pile underpinning technology is an effective method to develop underground space in retrofitting of existing buildings.
北京市音乐堂改扩建工程采用“两桩托一柱”的方法,转换结构传力体系,实现了基础整体托换,并增设了地下室,充分利用地下空间资源。
By analyzing the loading acted on culvert, it is an effective way to use integral foundation in culvert on high embankment when the separated foundation is limited.
北京市音乐堂改扩建工程采用“两桩托一柱”的方法,转换结构传力体系,实现了基础整体托换,并增设了地下室,充分利用地下空间资源。
By analyzing the loading acted on culvert, it is an effective way to use integral foundation in culvert on high embankment when the separated foundation is limited.
应用推荐