规定公司经济性度量质量体系有效性的范围和方法,确保通过质量成本分析来改进质量,进而达到提高经济效益。
Provisions of company economic measure the effectiveness of the quality management system and method, ensure the quality cost analysis to improve quality, and to improve economic benefit.
然后扩展分析银行模拟利润考核的有效性和模拟利润成本之间的权衡以及模拟利润的最优精确水平;
Secondly, it analyzes the tradeoff between the availability of the simulation profit check system and cost of the simulation profit, and calculates the accuracy level of the simulation profit.
通过价值链分析确定增值作业,建立各种体系,以此来保证煤矿成本控制系统的有效性。
By analyzing the value chain to ascertain increment task to construct system of many kinds in order to assure system's validity.
执行培训计划,定期分析培训效果,提出改进建议,不断降低培训成本和提高培训有效性;
Execute training plans and analyse training effectiveness regularly. Make improvement proposals to reduce training cost and improve training effectiveness;
新英格兰测试系统的分析结果表明,在系统总发电成本增加最小的情况下,系统的稳定程度已提高到设定的目标,证明了该算法的有效性。
The generator cost increased least after generation rescheduling to meet high stability requirements in New England test power system, which shows effectiveness of the algorithm.
分析表明:作业成本管理提高了产品信息的准确性、供应商管理的有效性及客户赢利性分析的可靠性。
The ABCM enhances accuracy of product information, the validity of suppliers' management and the reliability of customer profitability analysis.
结果表明,热经济学的成本分析模型同常规的分析方法结果一致,进一步验证了其分析的准确性和有效性。
The results show that this thermoeconomic cost diagnosis analysis model is closely consistent to routine analysis method, and its reliability is high.
成本-收益分析法是提高金融监管有效性的分析框架。
Cost and benefit analysis is the approach to study how to improve the efficiency of financial regulation and supervision.
在文中,首先分析了模型中的主反馈关系,构建系统的物质流图和成本结构流图,并证明了模型的有效性。
In the paper, we first analyzed the feedback relationship of the model, constructed system flow diagram, and proved validation of the model.
其次依据决策单元有效性的要求,运用灵敏度分析的思想,站在线性规划的角度,建立了质量成本分析模型;
This is based on the characteristics of the military enterprise and its products. A quality cost analysis model is set up according to linear programming sensitivity analysis.
用该模型求解两个产品开发过程的耦合任务集,验证了其有效性,并进一步分析了影响耦合集工期和成本的因素。
Finally, the model was applied to solve coupled task sets of two product development processes so as to validate its effectivenes.
用该模型求解两个产品开发过程的耦合任务集,验证了其有效性,并进一步分析了影响耦合集工期和成本的因素。
Finally, the model was applied to solve coupled task sets of two product development processes so as to validate its effectivenes.
应用推荐