因此如何在成本控制范围内,选择合适的建筑节能材料和建筑节能技术变得尤为重要。
Therefore, how to control the cost and select suitable building materials and building energy saving technology has become particularly important.
成本中心是成本控制范围中的一个组织单位,它表示的是某个产生成本的地方,可对照预算监控这个地方发生的成本。
A cost centers is an organizational unit within a controlling area that represents a specific location where costs are incurred and monitored against a budget.
但是使用到工时单,成本和日程安排等却使更重要的事情如项目利益、风险管理、持份者参与、质素、范围、目标控制等得不到应有的注目。
However, the use of time sheets, costs, and schedules far outweigh the more important issues like project benefits, risk management, stakeholder involvement, quality, scope, and objective control.
但是希腊、西班牙和爱尔兰却没有这种选择——他们没有自己的货币,在任何情况下都需要通过通货紧缩使成本控制在范围之内。
But Greece, Spain and Ireland don't have that option - they don't even have their own monies, and in any case they need deflation to get their costs in line.
具有成本意识的企业经营者对污染的容忍程度一般是在对污染的预期处罚超过控制排放的成本范围内。
Cost-conscious factory managers will generally tolerate pollution up to the point where the expected penalty for pollution becomes greater than the cost of controlling emissions.
系统在复杂性和成本上取得了优势,可以不考虑舰艇的类型,其类型范围从非常小的、单个操作员控制的系统到由35名以上操作员控制的大型系统。
The systems are balanced in complexity and cost, pending the type of ships, and range from very small, single operator systems to large systems of 35 + operators.
然而,许多美国国会议员天真地认为,如果我们简单地扩大覆盖范围,成本控制会自己负责。
Yet many in Congress naively think that if we simply expand coverage, cost control will take care of itself.
这次推广全民医保的可能结果将是,我们最终会通过一个规模适中的法案。该法案会将某些群体纳入医保的覆盖范围,但在成本控制方面恐怕难有作为。
The likely outcome of this year’s health care push is that we will get a medium-size bill that expands coverage to some groups but does relatively little to control costs.
拥有如此之高的利润率、并将固定成本控制在合理范围的企业,应该会兴旺发达。
Companies that enjoy this scale of margins - and keep their fixed costs within reasonable boundaries - should prosper.
她负责的范围广泛的各种责任,包括短期和长期的财务规划,成本控制,现金管理,会计和人力资源管理。
She is responsible for a comprehensive range of responsibilities including short and long term financial planning, cost control, cash management, accounting and human resource administration.
正如大部分各执己见的分析师们一直所辩称的那样,《奥巴马医改》的核心是扩大保险范围,而非控制成本。
ObamaCare focused on expanding coverage, not controlling costs, as most independent analysts argued all along.
项目经理花时间做的事情包括:规划、管理、分派任务,控制范围、时间成本、质量、风险、资源和客户满意度。
The project manager spends time planning, managing, assessing, and controlling scope, time, cost, quality, risk, resources, and customer satisfaction.
控制其产品销售、销售成本等数据,具体管理范围包括产品进货,产品销售,产品报损等。
Control of its product sales, cost of sales and other data, including the specific management of the purchase products, product sales, product loss, and so on.
经过对大量数据的分析整理,研究西安市范围内几类不同使用功能、结构形式建设项目的工期与成本控制指标值。
Via a lot of work on the large datum, this paper studies schedule and cost's control index values of engineering project by way of different functions and structure types in Xi 'an.
范围、时间、成本,这三项中哪些是可以由客户控制的?
How many of the three variables scope, time and cost can be fixed by the customer?
对供货范围、成本、进度、质量等进行有效控制。
Effectively control the delivery scope, cost, schedule and quality.
成本计划的实质就是使建筑师在设计时将工程成本控制在目标范围以内。
The essence of cost planning is to enable the architect to control the cost of a project (within the target) while he is still designing.
通过目标控制确保工程项目总体目标的实现,将项目的成本、工期、质量控制在预期的目标范围内。 。
The objectives control ensures the overall objectives so that the cost, the time and the quality of the project are limited to the acceptable objective scope.
本系统设计简单,成本低,组织灵活,控制范围可大可小。
This system has a simple design, low cost, and flexible organization.
就海外石油勘探开发项目成本控制中挣值管理的适用范围、挣值计算、成本预测等进行了分析。
The paper analyzes the application scope; earned value calculation, cost prediction of earned value management in overseas oil exploration and development of project cost control project.
准时完成采购任务,持续开发新供应商以降低交货风险及采购成本,确保中央仓库在控制范围内。
Complete the purchasing task timely, develop new supplier continually in order to reduce the delivery risk and purchasing cost, ensure that the central warehouse is under control.
应用范围很广,可以从车道里使用一个光传感器来控制LED聚光灯,到商业办公大楼里使用传感器来降低能源成本。
Applications can range from using a photo sensor to control an LED spotlight in your driveway to using an occupancy sensor to reduce energy costs in commercial office buildings.
充分理解DMO项目,包括项目的定义及范围,懂得成本控制计算方式,目标定时,执行方案及相关的工作。
Full understanding on the assigned DMO program - program definition and scope, Saving calculation, Timing targets, Execution plan and related activities.
本实用新型自动化程度高、测量参数全、测量精度高、适用范围广、成本低、由计算机控制。
The utility model has the advantages of high degree of automation, complete measurement parameter, high certainty of measurement, wide scope of application, low cost and computer control.
本文从理论上系统地阐述了高压脉冲电场杀菌装置控制系统的研制,设计出低成本矩形脉冲电源,并且能宽范围调节电场参数。
The development of sterilization device control (system) for HPEF is stated by the Numbers in theory. A cheap square pulsed supply is worked out and its (parameters) can be adjusted in a wide range.
关注项目成本的有效方案和活动,确保项目成本控制在投标阶段的预算范围内。
Observe the need to apply cost effective solutions and participate in ensuring costs are controlled within estimate.
关注项目成本的有效方案和活动,确保项目成本控制在投标阶段的预算范围内。
Observe the need to apply cost effective solutions and participate in ensuring costs are controlled within estimate.