负责项目成本和进度控制。
质量活动必须使成本和进度处于项目的控制之下,以满足CMM的精神。
Quality initiatives must lead cost and schedule in the control of the project to satisfy the spirit of the CMM.
构建阶段在某种意义上说是一个制造过程,在此阶段要强调对资源的管理和对操作的控制,用来优化成本、进度和质量。
The Construction phase is in some sense a manufacturing process, where emphasis is placed on managing resources and controlling operations to optimize costs, schedules, and quality.
在保证工程质量和进度的前提下,甲方如何合理控制自供材料的成本,非常值得探讨。
Under the premise of ensuring the quality and progress, the first party how to reasonably control costs confession material is very worth exploring.
而挣值管理作为一种新兴的项目集成化管理技术,能够实现产品研发进度、成本、质量和技术的综合管理与控制。
EVM, as a new project integrated management technique, is able to manage integratively and control product development progress, cost, quality and technique.
进度、成本和质量是工程项目管理的三大控制目标。
Time, cost and quality are the most important control objects of project management.
确定和控制产值、成本这两项工作都在工程的进度中。
Determining production and cost, and controlling both during the progress of the work.
本文就如何进行和提高控制因素中的成本控制、质量控制、进度控制等给予了本人的一些建议。
This article gives some Suggestions about how to conduct and improve the cost control, quality control and progress control in control factors.
项目管理的主要控制要素是质量、进度和成本。
The major control elements for a project management should be its quality, schedule and costs.
应用传统的成本和工期管理已经不能够准确反映出成本与进度的绩效水平,更不能进行信息的集成控制。
The cost of application tradition and the time limit management cannot mirror exactly the performance level of cost and progress, not to mention the integration control of information.
计划与进度控制、成本控制、质量控制和安全控制是工程项目管理的重要组成部分。
Plan and schedule control, cost control, quality control and safety control are important parts of project management.
事中成本控制除了要重视质量控制和进度控制,还要重视招投标控制,因为这是选择合作伙伴的过程。
In the performing cost control phase manager not only think lot of quality control and schedule control but also inviting public bidding control which is a process of choosing partner.
其三,重点研究了网络企业项目控制管理,包括进度控制管理、成本控制管理和质量控制管理。
Third, project control management of network enterprise is researched, including the progress control management, cost control management and quality control management.
负责对本项目的进度、质量、成本等实施。计划、组织、协调、控制和决策,对项目各要素实施全过程的动态管理。
The development putting the entire proceeding into practice manages the plan, organization, coordination, under the control of and every key element making policy, to the project.
综合运用各种项目管理方法和手段,有效地保证了项目的进度实施和成本控制。
By using these project management methods and skills, this project was undertaken successfully following the planned schedule and estimated cost.
从质量控制、进度控制和成本控制三方面分析了该模式的不利影响。
So this paper analyzes the adverse effects of the patterns from quality control, schedule control and cost control.
引入进度、质量、风险、成本联合控制思路以及具体措施和方法。
These are the theory and specific implementation of optimization the project organization model, scheduling, quality, risk and cost combinatorial controlling.
项目管理的目标是在保证质量前提下,寻找进度和成本的最优解决方案,对成本、进度有效地控制。
The goal of project management is to find the best solution to pace and cost and then control them effectively. But before doing so, we must know a prerequisite for it is the guarantee of quality.
美沃金属选用标准化的工业铝材及连接部件,完全保证客户需求,缩短设计组装时间,有效控制成本和工程进度,完美创造您的系统和理想空间。
Mevor Metal products Company adopt standard industrial aluminum products and connecting parts to meet our customers' needs, to create a perfect system and space for you efficiently.
项目管理:审核执行方案及排期,监管项目的执行情况、流程进度和成本控制,确保良好运行;
Project Management: Audit Implementation Programme, Regulatory implementation of the project to Ensure good operation;
介绍了施工前准备阶段和施工阶段中有关进度、质量、安全、成本和合同、信息、竣工的具体管理的控制方法和管理中的难点。
And the controlling methods and the key points of management during the preparatory stage and the construction stage are introduced including progress, quality, safety, cost, contract, informa...
介绍了施工前准备阶段和施工阶段中有关进度、质量、安全、成本和合同、信息、竣工的具体管理的控制方法和管理中的难点。
And the controlling methods and the key points of management during the preparatory stage and the construction stage are introduced including progress, quality, safety, cost, contract, informa...