按照批准的工程总进度计划,协调各专业进度计划实际运转,并督促进度计划的实施。
According to approval project general schedule, coordinating the practical operating of every specialty plan, and supervising the carrying out of process plan.
施工进度计划只是一个计划,总存在风险。
The construction schedule is only a plan, which always has risk.
买方技术人员到达工作现场后,双方的工地代表应对一份总的进度表和月度的工作计划进行协商并达成一致。
A general working schedule and a monthly plan shall be negotiated and agreed upon by the Site Representatives of both Parties after the arrival of the Seller's technical personnel at the Job Site.
图上可直接展示施工进度网络计划的各时间参数,特别是各工作的总时差和自由时差。
The each time parameter of construction schedule network planning in the graph may be exposed immediately, the total float and the free float of each work especially.
大坝混凝土施工是三峡工程能否按照总进度的要求达到计划目标的关键。
Concrete construction is the Three Gorges Dam project can progress in accordance with the requirements of the overall plan to achieve the key objectives.
工作总进度和月工作计划应在卖方技术人员到达工作现场后由双方的现场代表协商一致拟定。
A general working schedule and a monthly plan shall be negotiated and agree upon by the Site Representatives of both Parties after the arrival of the Seller's technical personnel at the Job Site.
工作总进度和月工作计划应在卖方技术人员到达工作现场后由双方的现场代表协商一致拟定。
A general working schedule and a monthly plan shall be negotiated and agree upon by the Site Representatives of both Parties after the arrival of the Seller's technical personnel at the Job Site.