OAT 使用进度条和其他有用的用户界面消息表示任务的总进度和每个部分的进度。
OAT represents the progress of the task and the progress of each part with progress bars and other helpful user interface messages.
这些问题都严重制约了总进度和总造价。
The aforesaid problems will seriously limit the total progress and investment.
我们应该根据工程项目标总进度表(构筑进度表)工作。
We should work according to the overall schedule chart (the construction time schedule) of the project.
大坝混凝土施工是三峡工程能否按照总进度的要求达到计划目标的关键。
Concrete construction is the Three Gorges Dam project can progress in accordance with the requirements of the overall plan to achieve the key objectives.
按照批准的工程总进度计划,协调各专业进度计划实际运转,并督促进度计划的实施。
According to approval project general schedule, coordinating the practical operating of every specialty plan, and supervising the carrying out of process plan.
施工导流是水利枢纽工程总体设计的重要组成部分,直接关系到工程总进度和工程总造价。
Construction diversion is important component of comprehensive design in water conservancy projects and has direct relationship with the whole engineering schedule and cost.
工作总进度和月工作计划应在卖方技术人员到达工作现场后由双方的现场代表协商一致拟定。
A general working schedule and a monthly plan shall be negotiated and agree upon by the Site Representatives of both Parties after the arrival of the Seller's technical personnel at the Job Site.
并通过施工总进度分析与优化、主要业务流程仿真运行改进,验证了该方法的可行性及实效性。
And the progress of construction through analysis and optimization, simulation run major business process improvement, test the feasibility of the method and effectiveness.
在某些情况下,这就像是进度检查,而且既不正式也不规律,天天总围着办公室转。
In some cases, this may mean nothing more than an occasional, informal progress check while making the rounds of the office.
施工进度计划只是一个计划,总存在风险。
The construction schedule is only a plan, which always has risk.
买方技术人员到达工作现场后,双方的工地代表应对一份总的进度表和月度的工作计划进行协商并达成一致。
A general working schedule and a monthly plan shall be negotiated and agreed upon by the Site Representatives of both Parties after the arrival of the Seller's technical personnel at the Job Site.
针对净化手术室工程总承包的特点,讨论工程项目管理中质量、进度、成本方面的问题及解决方法。
According to the feature of clean operating department project, discuss the project quality, schedule and cost management difficulties and the solutions.
EPC总承包项目在施工过程中存在较多的不确定因素和风险,势必影响其进度、质量、安全和成本目标的实现。
There are many uncertainties and risks in the construction process of EPC turnkey projects, which will definitely affect the progress, quality, safety and the realization of cost goals.
图上可直接展示施工进度网络计划的各时间参数,特别是各工作的总时差和自由时差。
The each time parameter of construction schedule network planning in the graph may be exposed immediately, the total float and the free float of each work especially.
通过对涟钢工程施工过程的回顾,总结提出了总承包项目施工进度管理的有效措施。
Through review of the construction process for Liansteel project, the effective measures for construction progress management of turnkey project were summarized.
通过对涟钢工程施工过程的回顾,总结提出了总承包项目施工进度管理的有效措施。
Through review of the construction process for Liansteel project, the effective measures for construction progress management of turnkey project were summarized.