该项工作总时差为9天。
本文研究CPM网络计划中总时差和单时差的使用效率问题及在项目管理中的应用。
In this paper, we study the efficiency of total floats and single floats in CPM network and their applications in the project management.
图上可直接展示施工进度网络计划的各时间参数,特别是各工作的总时差和自由时差。
The each time parameter of construction schedule network planning in the graph may be exposed immediately, the total float and the free float of each work especially.
工期索赔中考虑了工序的开工延迟以及工序的总时差,从而使索赔结论更具有说服力。
Because start time delay of activity and activity float time were all take into account in time claim, the conclusion was more convictive then before.
工作的总时差是工作的最主要时间参数之一,是网络图中关键工作和关键线路的判别依据。
The total float time is one of the important time parameters for a working task, and also is the basis for ascertaining critical work and critical paths in network planning.
工作总时差是工作最主要的基本时间参数之一,其大小是网络图中关键工作和关键线路的判别依据。
The basic principle of total time difference is analyzed, and a new thought of weight earned value is put forward.
本文揭示了传统网络构图模型系统结构的不相容性,从而实现了传统网络总时差的计算是错误的论证。
This paper shows the incompatability of system structure of the model of the network diagram, thus realizes the demonstration that algorithm for the total float of A on N and A on A is mistaken.
在实际工程中工序的资源量是受到严格限制的,传统的CPM法不能给出正确的工序总时差和关键路线。
In the practical engineering processes, the amount of resources is strictly limited, so in the actual engineering, the traditional CPM can not give the correct total float and critical path.
回国后我总还得花上两三天的时间来倒时差……但是今年没有。
Upon my return I usually get severe jet lag for at least 3 days…this year none.
回国后我总还得花上两三天的时间来倒时差……但是今年没有。
Upon my return I usually get severe jet lag for at least 3 days…this year none.