施工进度计划只是一个计划,总存在风险。
The construction schedule is only a plan, which always has risk.
图上可直接展示施工进度网络计划的各时间参数,特别是各工作的总时差和自由时差。
The each time parameter of construction schedule network planning in the graph may be exposed immediately, the total float and the free float of each work especially.
通过对涟钢工程施工过程的回顾,总结提出了总承包项目施工进度管理的有效措施。
Through review of the construction process for Liansteel project, the effective measures for construction progress management of turnkey project were summarized.
通过对涟钢工程施工过程的回顾,总结提出了总承包项目施工进度管理的有效措施。
Through review of the construction process for Liansteel project, the effective measures for construction progress management of turnkey project were summarized.