加速底板施工是控制底板总变形量的关键。
To speed up the bottom slab construction is the key point for controlling the deformation generally.
计算了管柱在不同温度和压力工况下管柱轴力、各节点应力、位移和整个管柱总变形量。
The stress and displacement of each node and total deformation of pipe string are computed which at different temperatures and pressure work conditions.
再将温度引起的热应力和外力(如边界条件)之和作为力载荷施加到物体,求得总变形量。
Exert hot stress and external force (such as border terms) that temperature cause as the strength load the object and then, try to get total deformation amount.
定向凝固工艺可有效提高镁合金铸锭的热轧成形能力,在轧制温度为673k的条件下进行热轧,总变形量可达94%以上而不出现裂纹。
Directional solidification could improve hot rolling formability of magnesium ingot effectively. The total deformation could reach 94% without cracking when hot rolling was held at 673k.
与滚动体及滚道的总永久变形量相对应的径向静负荷(中心轴向静负荷)。
Raceway and rolling body and the total permanent deformation of the corresponding radial static load (center of the axial static load).
与滚动体及滚道的总永久变形量相对应的径向静负荷(中心轴向静负荷)。
Raceway and rolling body and the total permanent deformation of the corresponding radial static load (center of the axial static load).
应用推荐