小组提交的作业是20分钟陈述,然后是15分钟的提问时间(总时间限制在35分钟内)。
The group deliverable is a 20-minute presentation followed by 15 minutes of questions (35 minute total time limit).
我们没有使用更大的设备或者给电力设备制造更大的负担,因此这项技术增加了我们作业的总运行时间。
You are not using the big engines, or putting so much strain on electrical equipment, so this technology adds to the overall uptime of my operations.
5次电缆作业总操作时间为67.5小时,比带电缆的连续油管作业节约至少约40%的时间,后者作业时间大约为5天。
The total wireline operating time of 67.5 hours for five runs was approximately 40% less than the estimated time for a similar e-coil intervention — approximately five days.
5次电缆作业总操作时间为67.5小时,比带电缆的连续油管作业节约至少约40%的时间,后者作业时间大约为5天。
The total wireline operating time of 67.5 hours for five runs was approximately 40% less than the estimated time for a similar e-coil intervention — approximately five days.
应用推荐