• 介绍水电站施工布置条件施工总体布置规划

    Conditions and general layout planning for Letan Hydropower Station are presented.

    youdao

  • 系统介绍上海东海大桥海上设计中的规划选址总体布置风机基础海缆观测等设计关键技术及解决方案

    Presentation on the planning and siting, overall layout, WTG foundation, submarine cable. observation etc. viewed as critical technical solutions in the design of Shanghai Donghai Offshore Wind Farm.

    youdao

  • 根据上海CBD核心区上海交通现状未来需求以及面临矛盾,确定了上海CBD核心区交通的规划目标功能定位,提出地下井字形通道规划总体布置和通道方案。

    Based on the status quo, the future demand and conflicts to be faced on the traffic for core area of CBD in Shanghai, the planning objectives and the function positioning have been specified.

    youdao

  • 根据上海CBD核心区上海交通现状未来需求以及面临矛盾,确定了上海CBD核心区交通的规划目标功能定位,提出地下井字形通道规划总体布置和通道方案。

    Based on the status quo, the future demand and conflicts to be faced on the traffic for core area of CBD in Shanghai, the planning objectives and the function positioning have been specified.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定