• 主要介绍露天深孔梯段爆破、减震爆破微差爆破最大装药量的控制措施和关系

    The relationship between the pre-splitting, vibration reduction, millisecond blasting and the maximum single detonating charge in open deep-hole large stage is introduced.

    youdao

  • 提高炮采面块煤率提出松动预裂微差爆破方案对布参数爆破参数进行了调整。

    To increase lump coal ratio in stopes, a scheme is put forward for coal falling by loose pre-shearing millisecond blasting, and hole arrangement parameters and blasting parameters are adjusted.

    youdao

  • 提高炮采面块煤率提出松动预裂微差爆破方案对布参数爆破参数进行了调整。

    To increase lump coal ratio in stopes, a scheme is put forward for coal falling by loose pre-shearing millisecond blasting, and hole arrangement parameters and blasting parameters are adjusted.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定