• 江津观音长江大桥为结合梁桥,防止桥面板湿接缝约束条件下产生裂缝,该桥面板湿接缝要求采用微膨胀混凝土补偿混凝土的收缩变。

    In order to prevent the cracks that would be likely caused by restricted conditions of the wet-joint, the wet-joint demands using expansive concrete to compensate the shrinkage and creep.

    youdao

  • 水文站长江干流最后一个控制,该站水文测验断面位于长江感潮河段。

    Xuliujing Hydrometric Station is the Last control station along the Yangtze River. The hydrometric section is located in the Yangtze River Estuary which feels tide.

    youdao

  • 水文站长江干流最后一个控制,该站水文测验断面位于长江感潮河段。

    Xuliujing Hydrometric Station is the Last control station along the Yangtze River. The hydrometric section is located in the Yangtze River Estuary which feels tide.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定