• 采用经验相结合方法确定整治水位整治线宽度设计方案主体结构形式

    The regulating water level, the width of regulating line, the regulating plan and major frame was confirmed using the way of combing design with experience.

    youdao

  • 上海市大线工程整个大芦线航道整治工程起点,位于五尺沟航段,其主要护岸形式单锚板桩结构,该文结合工程实践,总结了单锚板桩工程监理控制要点。

    A project in Dalu Line is the starting point of the whole Dalu Line Waterway Harnessing Project, and is located at the navigating section of Wucigou.

    youdao

  • 上海市大线工程整个大芦线航道整治工程起点,位于五尺沟航段,其主要护岸形式单锚板桩结构,该文结合工程实践,总结了单锚板桩工程监理控制要点。

    A project in Dalu Line is the starting point of the whole Dalu Line Waterway Harnessing Project, and is located at the navigating section of Wucigou.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定