LOLP考虑发电机组的强迫停运。
发电容量的退出是为了计划维修或计划停电,或者偶然由于非计划或强迫停运。
Generating capacity is taken out of service for scheduled maintenance or planned outage and is occasionally lost on an unplanned or forced outage.
但由于机组投运风险水平与机组强迫停运容量呈离散型的分布关系,因而难以与拉格朗日松弛法的机组组合算法有机结合。
However, the relation between unit commitment risk and forced outage capacity is a discrete distribution, the Lagrangian Relaxation unit commitment algorithm isn't used directly.
基于成本的分析表明,英国式的容量补偿主要考虑了机组强迫停运所引起的可靠性的容量价值补偿,而这一部分价值没有体现在能量市场规则中,所以补偿是必须的;
The early English capacity compensation payment is long-term reliability capacity value compensation, but it is not included in the spot energy market, so it is necessary to be compensated.
汽轮机快速冷却技术是在汽轮机组停运后,向汽轮机内部通以适量的较低温度的冷却介质,进行强迫对流换热,加快汽缸和转子温降速度的过程。
The fast cooling technology of steam turbine is the process that the cooling medium is used to accelerate the temperature reduction of cylinder and rotor after the shutdown of turbogenerator.
汽轮机快速冷却技术是在汽轮机组停运后,向汽轮机内部通以适量的较低温度的冷却介质,进行强迫对流换热,加快汽缸和转子温降速度的过程。
The fast cooling technology of steam turbine is the process that the cooling medium is used to accelerate the temperature reduction of cylinder and rotor after the shutdown of turbogenerator.
应用推荐