文中总结了万家寨引黄联接段工程中的PCCP管道施工经验。
In this paper, the construction experience of PCCP in the Connection Works of YRDP is summarized.
汾河水库作为引黄工程南干联接段的近期调节水库,也存在泥沙淤积问题;
The Fen 1 Reservoir, as the short term regulating reservoir of SM Connection Works, also has the sedimentation problem.
汾河水库作为引黄工程南干联接段的近期调节水库,也存在泥沙淤积问题;
The Fen 1 Reservoir, as the short term regulating reservoir of SM Connection Works, also has the sedimentation problem.
应用推荐