这种柔性阀门特性的形成与密封水的引水方式有关。
The flexible character is related to the location where the pressured water flows into the globe valve's seal.
工程总体由首部枢纽、引水渠、前池、压力钢管、主副厂房、尾水渠等建筑物组成,采用建坝和新开一段明渠的引水方式。
The engineering is made up with head hinge, diversion canal, fore bay, steel penstock, lord factory building, and the tail channel.
蒲石河抽水蓄能电站引水系统中的竖井开挖,拟采用反井钻机进行导井开挖,人工手风钻钻孔扩挖的方式施工。
The sequence of excavation for the shaft of diversion system at Pushihe storage power station is to excavate the pioneer well used by back well boring machine, then by hand air drill to expand it.
经过对三种消能方式的设计、水力学模型实验及工程实例的综合分析比较,最终选择消力池消能方案作为YLH拦河引水枢纽的最佳消能方案。
Compare with energy dissipation design and water conservancy model, last choose energy dissipation through power pool as YLH hurdle river hinge's engineering's prime energy dissipation way.
经过对三种消能方式的设计、水力学模型实验及工程实例的综合分析比较,最终选择消力池消能方案作为YLH拦河引水枢纽的最佳消能方案。
Compare with energy dissipation design and water conservancy model, last choose energy dissipation through power pool as YLH hurdle river hinge's engineering's prime energy dissipation way.