并与传统异向流斜管沉淀水力计算公式进行了比较,分析了沉淀墙的负荷公式及提高其负荷的途径。
Compared with traditional hydraulic calculation formula of opposite flow sedimentation, load formula of sedimentation wall was analyzed, and the way to improve load was provided.
并与传统异向流斜管沉淀水力计算公式进行了比较,分析了沉淀墙的负荷公式及提高其负荷的途径。
Compared with traditional hydraulic calculation formula of opposite flow sedimentation, load formula of sedimentation wall was analyzed, and the way to improve load was provided.
应用推荐