长180公里的连云港至徐州高铁今年向公众开放了。
The 180-kilometer-long Lianyungang-Xuzhou High-speed Railway was open to the public this year.
根据船厂的使用要求及升船机港池的结构特点,升船机港池采用放坡开放式的港池方案。
According to the operation of the dockyard and the structure of ship lift harbor, open scheme of ship lift harbor was applied.
根据船厂的使用要求及升船机港池的结构特点,升船机港池采用放坡开放式的港池方案。
According to the operation of the dockyard and the structure of ship lift harbor, open scheme of ship lift harbor was applied.
应用推荐