• 针对国内外规范开启时间不同规定,结合理论推导数值计算实例分析不同的导开启时间水电站过渡过程影响

    The effect of wicket opening time for water turbine on the transient process of hydropower station was studied by theoretical analysis and numerical calculation.

    youdao

  • 计算结果显示泵站起动过程中,闸门开启延时时间以及闸门开启速度起动过渡过程均有明显影响

    The results show that, in the tubular pump start the process, the delay time of opening gate and the speed of the starting gate are significant influence the transition process.

    youdao

  • 计算结果显示泵站起动过程中,闸门开启延时时间以及闸门开启速度起动过渡过程均有明显影响

    The results show that, in the tubular pump start the process, the delay time of opening gate and the speed of the starting gate are significant influence the transition process.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定