摘要:设备对工程建设造价的影响越来越大。
Abstract: Equipmenton the growing influence of engineering construction cost.
本文分析了目前我国公路建设造价控制和管理中存在的问题,并提出了对公路工程造价进行全过程管理的相关策略。
Current China's road construction cost control and management problems are analyzed and related strategies for highway project cost of the whole process management are proposed.
风电需要造价昂贵的电网建设,而电网基建反过来又得通过复杂而耗时的审批手序。
It requires expensive grid infrastructure, which in turn rests on a complex and time-consuming approval process.
提出建设项目从施工阶段到竣工阶段,其造价控制的有效途径和方法。
Propose the effective way of controlling the cost of construction project from the construct stage to the very end of the project.
工程造价是指进行某项工程建设所花费的全部费用。
The project construction cost is refers carries on the complete expense which some engineering construction spends.
工程造价是指进行某项工程建设所花费的全部费用。
Project cost is the construction of a project to spend the full cost.
水下隧道的覆盖厚度对其建设的安全和造价起着重要作用。
The covering thickness of underwater tunnel plays an important role in safety and cost of its construction.
从项目决策阶段、设计阶段、招投标阶段、施工阶段,竣工结算阶段等几个方面对建设工程造价控制做了介绍。
The paper introduces how to control the cost of construction works from item decision-making phase, design phase, tender phase, construction phase and settlement phase.
工程造价的控制,贯穿于整个工程建设的全过程。
The engineering cost control, passes through in the entire process of engineering construction.
造价管理是公路建设管理中一项重要内容。
Cost management is one important part of highway construction management.
而原子能电站需要极其大的规模且造价昂贵,又产生过多不需要的能源,因此没有必要建设原子能电站。
Nuclear energy would require an extremely large and expensive generator which would produce a lot of unneeded power. Therefore, nuclear energy would prove inefficient.
造价管理是工程建设管理的一项非常重要的内容,愈来愈受到高度重视。
Cost management is a key content for engineering construction management, and is paid attention to more and more importantly.
论述了从初步设计到工程竣工验收各个阶段工程建设的造价控制。
It is discussed how to control the cost of a project in its various stages from the beginning of design to the cheeking before acceptance.
本文分析了建设项目施工阶段造价失控的原因,并有针对性地提出建设项目施工阶段造价控制采取的措施。
This paper analyzes the construction project construction phase cost of out of control of reason, and then provided some project construction project construction cost control measures.
基本建设的造价控制应注重全过程的动态控制。
The cost control of capital construction ought to lay stress on the dynamic control in the whole process.
本文分析、比较了当前我们在住宅建设的前期造价控制阶段存在的问题,针对这些问题提出了相应的解决方法,为更好、有效地控制工程造价提出了意见和建议。
This article analyses and compares the problems existing in the cost control of the early stage, and it discusses a solution to control the project cost effectively.
本文通过分析医院基建项目造价管理的关键影响要素,就建设过程中的造价管理给出若干见解和倡议。
Through analysis of the key influencing factors of hospital construction project cost management, this article proposes some opinions and Suggestions for construction cost management.
工程建设过程中,合理的控制工程造价和节约建设资金越来越为投资者所重视和关注。
The rational controlling of engineering cost and saving construction capital are more and more paid attention by investors in engineering construction process.
摘要:市政基础设施项目建设工程造价的控制与管理贯穿于工程建设的全过程。
Abstract: : the control and management of the cost of construction of municipal infrastructure projects throughout the whole process of construction projects.
阐述了建设工程造价管理的现状,分析了建设工程造价管理存在的问题和解决方法。
This paper details the present state of construction project cost management and analyses the problems in construction project cost management and the methods to solve these problems.
从三个方面论述了建设项目的全过程造价控制工作。
The paper discusses the full process control of the project cost from three aspects.
从建设项目的决策、设计、发包、施工等四个阶段讨论投资方如何对建设项目造价进行合理控制。
How to control the construction project cost reasonably for investors is discussed from four stages of the decision making, design, contracting, and construction.
论述了公路建设各个阶段造价的控制途径,力求在项目建设过程中能够合理的利用资源,取得较好的效益。
The paper discusses ways to control of costs at every stage of highway building to strive to reasonably utilize resources in project building and to gain a better results.
建设工程造价管理贯穿于工程建设全过程,从工程建设立项到工程项目决策每个环节都存在着造价管理。
Construction engineering cost management throughout the whole construction course, from engineering construction project to project decision-making every link exists cost management.
建设项目的工程造价管理不再是局限于事后结算,已延伸至整个建设项目的全过程。
Construction cost management has been extended to the entire construction project and it is not confined to the settlement.
建设项目工程造价的控制是一个贯穿项目建设全过程的复杂的系统工程。
The control of engineering cost of construction item is a complex system engineering that penetrates the whole process of construction.
合理确定有效控制造价,必须按基本建设程序办事,以设计为重点进行全过程的造价控制和科学管理。
In must be follow basis construction program if want to logical confirm effective control cost, base on design as key point take full process cost control and science management.
合理确定有效控制造价,必须按基本建设程序办事,以设计为重点进行全过程的造价控制和科学管理。
In must be follow basis construction program if want to logical confirm effective control cost, base on design as key point take full process cost control and science management.
应用推荐