本文从建立工程项目管理体系的背景、目的和意义入手,简要介绍了论文的研究思路与技术路线。
The article is based on the background and purpose of establish the engineering project management system. This article makes a brief dissertation research ideas and technology line.
本文探讨了工程设计流程智能化管理,指出了建立工程项目设计流程管理模型的方法,以及系统的详细分析与设计。
The paper discusses the principle of engineering design, points the way of setting up management model of engineering item design and the detailed analysis and design of the system.
介绍了质量控制系统的目标、要求、依据及如何建立一个完善的质量控制系统,达到提高工程项目质量的目的。
The target, requirement and basis of quality control system as well as how to establish a perfect quality control system for improving the engineering project quality are introduced.
本文首先建立了工程项目生态系统的理论框架,并探讨了它的一般规律。
This thesis, firstly, establishes the theoretical framework for the projects ecosystem, then discusses its general laws.
本论文还讨论了在工程项目招投标管理信息系统中如何建立决策支持系统,以及进一步建立专家系统。
Furthermore, the thesis discusses how to establish a decision-making supportive system in the project bid-invitation managing information system and establishes an authorized system ulteriorly.
将模糊数学与层次分析方法相结合,建立了模糊层次分析模型并应用于工程项目质量风险分析。
Fuzzy math and the theory of AHP are combined to set a fuzzy overall analysis model, which is used in the engineering project quality risk analyses.
随着各种新型复杂系统的建立和工程项目的实施,常规可靠性设计理论与工程实践的矛盾日益突出。
With the establishment of various new complicated systems and the completion of a number of projects, the regular reliability designing theory contradicts more and more the project performance.
作为一个完整的建筑工程项目管理体系,还应该建立完善质量自检制度。
This article analyzes the construction project management in the key of the project cost management strategies for improvement.
通过对大量地震震害调查,建立了同一工程项目的基本条件关联系数的近似处理方法。
Through large earthquake damage survey, we establish approximate treatment means on essential condition association coefficient of the same project.
分析结果表明,本文所建立的风险评价模型,能够更加直接、客观的进行风险评价,为港口工程项目风险评价提供可靠的依据。
The result shows that the risk evaluation mode, overcoming the disturbing of many uncertain factors, can provide us with credible reference about the port project more directly and impersonally.
本文根据层次分析法的基本原理,建立了工程项目成功决定因素的层次分析模型。
According to the basic principle of hierarchical analyzing theory, this paper establishes the hierarchical analyzing model of factors determining the success of engineering project.
详细阐述了简要、合同和工程项目工作分解结构的用途和建立方法。
It describes in detail the usage and establishment methodology for sunmma- ry WBS, contract WBS and engineering project WBS.
随着各种新型复杂系统的建立和工程项目的实施,常规可靠性设计理论与工程实践的矛盾日益突出。
With the establishment of various new complicated systems and the complement of a number of projects, the regular reliable designing theory contradicts more and more the project performance.
为实现对燃气工程项目的有效过程管理和控制,建立了燃气工程信息管理系统。
In order to implement the effective process management and control of gas engineering project, a gas engineering information management system is established.
以承包的国际工程项目为研究对象,建立承包风险评估层次分析模型。
The projects contracted in international market are the research objects in this article.
目前我国铁路建设工程项目的绩效评价仍然是建立在传统的以经验判断为主体的评价手段基础上,缺乏客观的标准。
At present, performance evaluation of railway construction project in China is based on the tradition of experience as the main means of evaluation, which lack the objective criteria.
建立了用于地下工程项目风险综合评价的指标体系。
No3 Setting up an indexes system suitable for risk assessment of underground engineering projects .
本文通过对外资建设工程项目管理模式进行分析,建立一套适合国内外资建设工程项目管理模式选择的指标体系。
The paper establishes a set of selection indicators of project management mode for foreign-funded construction at the base of analyzing the mode of the construction project management.
企业在ERP应用过程中必须从系统工程和科学管理的角度出发,建立健全工程项目管理体系和运作机制,确保ERP项目的成功实施。
To ensure erp's successful implementation, the enterprise must establish integrated engineering project management system and running mechanism from the point of view of system eng...
建立基于过程评价、效益评价、影响评价与可持续性评价的工程项目后评价指标体系。
A post evaluation index system is presented for the construction project on the basis of the process evaluation, effectiveness evaluation, impact evaluation and sustainability evaluation.
结合具体工程项目对三维动画技术特点、模型的建立及工程中三维动画内容的设计与实现作了详细的介绍。
Combined with specific engineering items, the characteristics of 3d Animation technique, the establishment of the design and realization of 3d Animation contents were introduced in details.
建立切实可靠的铁路建设工程项目管理绩效评价指标体系是铁路建设工程项目评价的基础。
The evaluation of railway construction project is based on establishing a practical and reliable index system for the performance evaluation of railway construction project management.
在对工程项目管理进行分析后,以此为基础提出了在工程项目管理中建立关键绩效指标(KPI)体系的重要意义。
Based on the analysis of project management, the significance of establishing Key Performance Indicators (KPI) system in the project management is addressed.
从而建立起一个针对液化石油气储罐泄漏的风险评价方法体系,并在实际工程项目中进行了应用验证。
So then a methodology system of LPG tank leakage risk assessment is established. And it is verified by being used in the project.
从而建立起一个针对液化石油气储罐泄漏的风险评价方法体系,并在实际工程项目中进行了应用验证。
So then a methodology system of LPG tank leakage risk assessment is established. And it is verified by being used in the project.