控制临时或延迟约束检查。
由于其计划、资源可用性和其他业务约束会导致一些延迟。
Some of the delay resulted from their schedules, availability of resources, and other business constraints.
软件更新的大小各不相同,而了解网络基础结构的约束条件则可以潜在地减少分发软件更新时的延迟。
Software updates can vary in size, and knowing the constraints of your network infrastructure can potentially reduce any delays in distributing software updates.
强时间约束是指控制数据流图CDFG的延迟时间无法满足的时间约束。
The strong time constraints are the time constraints when the delay time of Control Data Flow Graph (CDFG)is not satisfied.
结果是提出了基于延迟和延迟抖动约束的SPF算法,并给出了完整的建立组播树的流程图。
The result is that the delay-Jitter-SPF algorithm and the flow graph of the building of the multicast tree with QoS constraints are proposed.
在作业加工时间简单线性恶化下,提出作业的非负开始和停止延迟恶化率,构造了满足约束条件的复合作业。
Under the simple linear deteriorating, nonnegative start and stop lag deteriorating rates are introduced so as to combine jobs and construct composite jobs satisfying precedence relations.
在作业加工时间简单线性恶化下,提出作业的非负开始和停止延迟恶化率,构造了满足约束条件的复合作业。
Under the simple linear deteriorating, nonnegative start and stop lag deteriorating rates are introduced so as to combine jobs and construct composite jobs satisfying precedence relations.
应用推荐