采用叉车和盘车手工制做阳极棒使第二阶段的极棒生产厂存在着延期建设的可能性。
It is possible to postpone the construction of the rodding shop to Phase 2 by rodding the anodes manually using forklift trucks and jigs.
周四,希腊官员否认了此种说法,即雅典所面临的严重的工程建设延期将使得比赛场所和交通运输系统更易受到攻击。
Greek officials on Thursday denied claims that serious construction delays facing Athens could leave venues and transit systems more vulnerable to attacks.
这八对他们因繁忙的大桥建设进度将他们的婚姻延期,新人接受了来自同事们的美好祝福。
The eight young couples, who postponed their marriage due to the busy construction schedule of the bridge, accepted delayed best wishes from their colleagues.
需求波动是信息系统建设中比较常见的风险,很可能造成进度延期、成本超支甚至项目取消。
Requirements volatility (RV) is a common information system project risk that can have severe consequences including cost and schedule overruns and at times, even cancelled projects.
[摘要]建设工程项目工程延期的影响因素错综复杂。
Abstract: The influencing factors of the source of construction project duration extension are complicated.
在考虑业主支付延期的基础上建立工程建设项目动态现金流预测模型。
After classifying project cost is advised according to their payment lags and considering the delaying of the clients payment, the project cash flow dynamic forecasting model is made.
在考虑业主支付延期的基础上建立工程建设项目动态现金流预测模型。
After classifying project cost is advised according to their payment lags and considering the delaying of the client's payment, the project cash flow dynamic forecasting model is made.
在考虑业主支付延期的基础上建立工程建设项目动态现金流预测模型。
After classifying project cost is advised according to their payment lags and considering the delaying of the client's payment, the project cash flow dynamic forecasting model is made.