• 文章阐述如何通过控制基坑施工主要影响参数,进而限制底土体隆起减小隧道位移

    The paper provides the key factors to control the pit construction by restricting heave of the bottom soil and minimizing tunnel displacement.

    youdao

  • 采用降低渗透性措施选择最佳降水深度有效控制坑外地表的沉降

    By reducing the permeability of soil at the bottom of pit and selecting optimal dewatering depth, the settlement of ground surface can be well controlled.

    youdao

  • 采用降低渗透性措施选择最佳降水深度有效控制坑外地表的沉降

    By reducing the permeability of soil at the bottom of pit and selecting optimal dewatering depth, the settlement of ground surface can be well controlled.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定