• 针对并行工程产品开发过程中的活动规划问题,提出了一种启发式规划方法

    A heuristic scheduling approach based on the characteristics of concurrent activities in product developing process is presented.

    youdao

  • 针对并行工程产品开发过程活动特点提出了一种启发式并行活动规划方法

    A heuristic programming method is presented based on the characteristics of concurrent activities in the product development process.

    youdao

  • 分析并行工程支撑条件遵循原则提出了汽车产品开发过程并行工程实施方案团结协作型模型

    This essay illustrates the precondition, principle of parallel engineering, and provides the implemented measures and models of coordinated team of parallel engineering in development of automobile.

    youdao

  • 重点分析产品开发过程各阶段应用并行工程的可靠性管理工作,将其应用车架失效原因分析、反馈改进中,降低生产成本缩短产品开发周期。

    And then this method was applied to the bus frame's failure analysis, feedback and improvement. This application can reduce costs effectively and shorten the implementary cycle.

    youdao

  • 并行工程环境上游产品设计活动下游过程设计活动之间重叠缩短产品开发过程持续时间

    In concurrent engineering, the overlap between the upstream product design activity and the downstream process design activity can shorten the duration of the product development process.

    youdao

  • 并行工程环境上游产品设计活动下游过程设计活动之间重叠缩短产品开发过程持续时间

    In concurrent engineering, the overlap between the upstream product design activity and the downstream process design activity can shorten the duration of the product development process.

    youdao