• 研究设计周期(18个月)泄漏平衡循环秦山二期扩建工程制定了一具有工程实用价值的燃料管理方案

    Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.

    youdao

  • 满足CFB锅炉物料平衡要求灰份燃料需要添加一定粒径分布的可循环物料。

    For meeting stuff balancing requirements of CFB boilers, circulatable material of a certain size-range has to be added to fuels of low ash content.

    youdao

  • 耦合燃耗计算程序COUPLE2.0模拟得到深燃耗气冷快堆的铀燃料循环平衡态。

    The coupled depletion calculation code COUPLE2.0 was used to get the equilibrium states of 300 MWt pebble bed GFR.

    youdao

  • 耦合燃耗计算程序COUPLE2.0模拟得到深燃耗气冷快堆的铀燃料循环平衡态。

    The coupled depletion calculation code COUPLE2.0 was used to get the equilibrium states of 300 MWt pebble bed GFR.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定