对具有无限方差的一阶自回归非平稳过程进行了研究。
We study the unstable autoregressive process for the first order with infinite variance.
建立屏山站日流量分期平稳自回归模型,并模拟了序列长度为5200年的日流量过程对该模型进行检验。
Divided period Stationary Autoregressive model for daily flow of Pingshan hydrological station is established in this paper. Daily flow procedure during 5200 years is simulated to test this model.
建立屏山站日流量分期平稳自回归模型,并模拟了序列长度为5200年的日流量过程对该模型进行检验。
Divided period Stationary Autoregressive model for daily flow of Pingshan hydrological station is established in this paper. Daily flow procedure during 5200 years is simulated to test this model.
应用推荐