本文详细介绍了某300MW机组在起动及带负荷运行过程中产生振动异常的处理情况。
The paper gives a particular analysis on a 300MW turbogenerator that the abatement process of the abnormal vibration on the turbine during the first start-up and running with load.
当机组准备带负荷时,厂用电系统从起动电源切换到机组电源。
When the unit is ready to accept load, the auxiliary power system is transferred from the start-up to the unit source.
当机组准备带负荷时,厂用电系统从起动电源切换到机组电源。
When the unit is ready to accept load, the auxiliary power system is transferred from the start-up to the unit source.