报告还说,由于过去预期过分乐观,现在对项目效益成本分析的报告已成为最为迫切的要求。
The report argued that the need for cost-benefit analyses was made all the more urgent since DE had long suffered from a history of overly optimistic expectations.
报告还说,由于过去预期过分乐观,现在对项目效益成本分析的报告已成为最为迫切的要求。
The report argued that the need for cost-benefit analyses was made all the more urgent since DE had long suffered from a history of overly optimistic expectations.
应用推荐