然后提出了基于分项工程量清单造价管理体系的造价变更来源的识别方法;
Third based on the sub-item resilience detailed list's construction cost management, proposed the construction cost change originates recognition methods.
工程造价指数可以广泛应用于工程造价管理的各个阶段,对工程量清单计价规范的推行和应用具有一定的实用价值。
Construction cost index can be widely applied to every stages of construction cost management and has considerable practical value in respect of implementation and use of BOQ.
介绍了工程量清单报价内容、操作方法及在工程造价管理中的应用。
The contents for detailed list quoted price engineering amount, method of operation and meaning m engineering cost management are introduced.
在工程量清单计价模式下工程造价由分部分项工程费、措施项目费、其他项目费、规费和税金等构成。
When pricing based on bill of quantities, the project cost consists of sub-engineering fee, measure fee, other fee, regulate fee and tax.
本文对工程量清单计价进行了简要分析,并着重探讨了该模式下工程造价的控制。
In this paper a brief analysis of the bill of quantities, and focused on the project cost control in this mode.
工程量清单计价方法是国际上较为通用的一种先进的造价管理方法。
The valuation mode of BOQ is an International common and advanced method in pricing management.
推行工程量清单计价,工程造价管理必须实现从静态管理到动态管理的一系列转变。
To implement the BOQ type measurement and payment, a series of transitions from static management to dynamic management should be realized in project cost management.
实施工程量清单计价后,造价管理有很多工作要做。
After the execution of the listing valuate of the amount of works, there are still many work to do.
我国已加入WTO,我国的工程造价管理将不得不遵循的国际惯例采用工程量清单计价模式。
With China having been the member of WTO, the engineering cost management in our country will adopts the bill of quantities mode which is widely used in international bidding.
应用BP神经网络算法对工程量清单的分项工程价格进行快速估算,为分项工程单方造价提供新的计算方法和理论。
Abstract: BP network is applied in quick estimation of parts cost of Bill Of Quantity(BOQ) in this paper. It provides a new calculation method and theory for meter cost of sub-project.
合理确定招标工程量清单是有效实施工程造价事前控制的重要环节。
To make BOQ (Bill of Quantity) reasonable is a key measure to approach the goal of preceding cost control effectively.
第二步对分解到位的模块按照以工程量清单编码为基础的原则进行编码,以便于控制过程中的计算机辅助管理和工程造价的对应信息传输。
In order to fulfill the information exchange of CAM and project cost in the control process, the second step is to coding the analyzed modules based on the codes of construction quantity bill.
[摘要]应用BP神经网络算法对工程量清单的分项工程价格进行快速估算,为分项工程单方造价提供新的计算方法和理论。
Abstract: BP network is applied in quick estimation of parts cost of Bill of Quantity (BOQ) in this paper. It provides a new calculation method and theory for meter cost of sub-project.
[摘要]应用BP神经网络算法对工程量清单的分项工程价格进行快速估算,为分项工程单方造价提供新的计算方法和理论。
Abstract: BP network is applied in quick estimation of parts cost of Bill of Quantity (BOQ) in this paper. It provides a new calculation method and theory for meter cost of sub-project.
应用推荐