• 摘要水利工程设计概算必须依据设计工程量施工组织设计,按概算编制规定概算定额进行编制。

    Abstract: Hydraulic engineering design budget must be based on the design engineering, construction management planning, budget preparation and budget quota.

    youdao

  • 标书编制主要包括施工方案工程量清单报价两个部分

    The preparation of the tender include two parts of the volume of construction and a list of offering engineering programs .

    youdao

  • 制定工程量清单计价体系适应建设工程施工合同条件

    Enacting the construction contract condition of the construction engineering, which is suitable for the valuation system of the list of engineering amount.

    youdao

  • 建设工程工程量清单计价规范实施施工企业投标时进行成本预测提出新的要求

    The implementation of the Specifications of Charging by Bill of quantities has set new requirements for cost forecast by construction enterprises in bidding activities.

    youdao

  • 本文论述工程量清单招标特点及其工作准备工作程序指导实施工程量清单招标具有指导作用

    This paper states the characteristic of engineering bill bidding and its working program to provide direction function for implementing engineering bill bidding.

    youdao

  • 目前建设中,岩巷掘进工程量一般约工程量40% ~ 50%,施工工期占35% ~ 50%。

    At present, in the building of new shaft, rock drivage takes 40%-50% of whole project, and the construction takes 35%-50%.

    youdao

  • 工程量清单报价目前广州地铁普遍采用施工招投标方式

    List quotation is generally adopted in construction bid at present by Guangzhou Metro.

    youdao

  • 合理确定招标工程量清单有效施工造价事前控制重要环节。

    To make BOQ (Bill of Quantity) reasonable is a key measure to approach the goal of preceding cost control effectively.

    youdao

  • 阐述我国实行工程量清单计价重大意义探讨了现阶段实施工程量清单计价中遇到的问题提出了完善措施

    This thesis expounds the significance of promoting the bill of quantity valuation, discusses the existing problems and proposes some countermeasures for their solution.

    youdao

  • 大坝混凝土施工百色水利枢纽主体工程施工关键施工时间短工程量相对较大

    The main dam concrete construction is the key of the Baise WRPP main body project construction. Its working term is shorter and the construction quantity is larger.

    youdao

  • 工程量清单模式招标,在工程建筑领域来说,国内现行招投标方法、工程计价方式施工技术很大冲击

    To the construction project, our country present move of bid method, the project valuation way, the traditional construction technique has been under the very big impact.

    youdao

  • 【摘要】工程量清单计价模式下在工程招标、施工阶段竣工结算成本控制重点和方法。

    The project, under BOQ tenders for the construction phase and completion of settlement in focus and methods of cost control.

    youdao

  • 实施工程量清单计价,造价管理很多工作

    After the execution of the listing valuate of the amount of works, there are still many work to do.

    youdao

  • 施工设计包括清单工程量计算工程量清单报价(商务)、施工技术标、施工进度计划施工平面图编制

    Construction design includes: a list of projects in terms of Quantity Price (Business standard), standard construction techniques, construction schedule and construction plan preparation.

    youdao

  • 传统主要适用于工程量清单合同条件下施工单位项目管理活动。

    Abstract: The traditional Earned Value Method(EVM) is mostly used at the condition of BOQ.

    youdao

  • 本文就现阶段实施工程量清单计价存在问题进行了分析,提出具有可操作性实用性建议

    The paper analyzed the problems at the using of project amount list and proposed the operational and practical suggestion.

    youdao

  • 本文就现阶段实施工程量清单计价存在问题进行了分析,提出具有可操作性实用性建议

    The paper analyzed the problems at the using of project amount list and proposed the operational and practical suggestion.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定