摘要:水利工程设计概算必须依据设计工程量、施工组织设计,按概算编制规定及概算定额进行编制。
Abstract: Hydraulic engineering design budget must be based on the design engineering, construction management planning, budget preparation and budget quota.
本标书的编制主要包括施工方案和工程量清单报价两个部分。
The preparation of the tender include two parts of the volume of construction and a list of offering engineering programs .
制定与工程量清单计价体系相适应的建设工程施工合同条件。
Enacting the construction contract condition of the construction engineering, which is suitable for the valuation system of the list of engineering amount.
《建设工程工程量清单计价规范》的实施,对施工企业在投标时进行成本预测提出了新的要求。
The implementation of the Specifications of Charging by Bill of quantities has set new requirements for cost forecast by construction enterprises in bidding activities.
本文论述了工程量清单招标特点及其工作准备和工作程序,对指导实施工程量清单招标具有指导作用。
This paper states the characteristic of engineering bill bidding and its working program to provide direction function for implementing engineering bill bidding.
目前,在新井建设中,岩巷掘进工程量一般约占总工程量的40% ~ 50%,施工工期占35% ~ 50%。
At present, in the building of new shaft, rock drivage takes 40%-50% of whole project, and the construction takes 35%-50%.
工程量清单报价是目前广州地铁普遍采用的施工招投标方式。
List quotation is generally adopted in construction bid at present by Guangzhou Metro.
合理确定招标工程量清单是有效实施工程造价事前控制的重要环节。
To make BOQ (Bill of Quantity) reasonable is a key measure to approach the goal of preceding cost control effectively.
阐述了在我国实行工程量清单计价的重大意义,探讨了现阶段实施工程量清单计价中遇到的问题,并提出了完善措施。
This thesis expounds the significance of promoting the bill of quantity valuation, discusses the existing problems and proposes some countermeasures for their solution.
大坝混凝土施工是百色水利枢纽主体工程施工的关键,施工时间短,工程量相对较大。
The main dam concrete construction is the key of the Baise WRPP main body project construction. Its working term is shorter and the construction quantity is larger.
工程量清单模式下招标,在工程建筑领域来说,国内现行的招投标方法、工程计价方式、施工技术都有很大的冲击。
To the construction project, our country present move of bid method, the project valuation way, the traditional construction technique has been under the very big impact.
【摘要】工程量清单计价模式下在工程招标、施工阶段和竣工结算中成本控制重点和方法。
The project, under BOQ tenders for the construction phase and completion of settlement in focus and methods of cost control.
实施工程量清单计价后,造价管理有很多工作要做。
After the execution of the listing valuate of the amount of works, there are still many work to do.
施工设计包括:清单工程量计算、工程量清单报价(商务标)、施工技术标、施工进度计划及施工平面图的编制。
Construction design includes: a list of projects in terms of Quantity Price (Business standard), standard construction techniques, construction schedule and construction plan preparation.
传统挣值法主要适用于工程量清单合同条件下施工单位项目管理活动。
Abstract: The traditional Earned Value Method(EVM) is mostly used at the condition of BOQ.
本文就现阶段实施工程量清单计价中存在的问题进行了分析,并提出具有可操作性和实用性的建议。
The paper analyzed the problems at the using of project amount list and proposed the operational and practical suggestion.
本文就现阶段实施工程量清单计价中存在的问题进行了分析,并提出具有可操作性和实用性的建议。
The paper analyzed the problems at the using of project amount list and proposed the operational and practical suggestion.