本文的研究成果对业主及施工单位的工程进度管理工作具有一定的借鉴作用。
In this paper, the results of research have a reference to the construction progress of the project management and its related owner.
有时柱状图也被称为甘特图,管理者用它能快而准地知道任何一天的工程进度,也能将实际进度和计划进行比较。
Bar charts, sometimes known as Gantt charts, allow managers to quickly see exactly where the project is at any given date and compare actual progress with planned progress.
着重论述了本条款在公路投标、施工组织、工程进度、工程质量、工程费用、合同管理各个阶段中的应用。
In this paper author introduces the application of this article in road bidding, construction management, engineering schedule, engineering quality, engineering cost and contract management.
PERT技术的网络计划软件是基于编制工程进度计划要求而开发的一种新兴的工程管理技术软件。
Network planning software based on PERT technology is a new kind of project management software developed for compiling schedules for projects.
使用传统的手工管理难以适应工程进度的要求。
The traditional management method could not meet the requirements the project construction progress.
摘要:在路桥工程项目建设中,管理是工程建设的核心环节,直接影响到工程进度以及工程质量。
Abstract: : on the road and bridge construction projects, management is the core part of project construction, a direct impact on project progress and project quality.
在大型工程项目方面管理本地职员和与客户在工程进度方面沟通。
In larger projects you will manage local employees and you will communicate with the customer on progress.
因此,在现代施工项目管理中,对工程进度的控制和管理成为一项极为重要的工作。
Therefore, in the management of modern construction projects, it is becoming an important work to control and manage the construction schedule.
只有加强施工管理,推广使用新管理方法,才能促进工程进度,缩短工期,节约资金,降低造价。
Strengthen construction management and extend use new management method can promote engineering schedule and shorten time of project and saving fund and reduce cost.
安装工程开工前的技术准备工作非常重要,它是保证工程进度、工程质量、降低工程成本、搞好现场HSE管理的先决条件。
Technical preparation work is very important, and it is a precondition of ensuring project progress and quality, decreasing project cost and offering good field HSE management.
这类项目的物料管理会直接影响项目成本和工程进度。
The management to these materials will affect directly project cost and process.
在FIDIC合同条件下,工程进度的控制主要包括有关工程进度计划管理和工程延误、工程延期的规定。
Under FIDIC condition of contract, the project progress control mainly includes project progress management, project delay and project extension stipulation.
工程管理软件P3可对工程进度的全过程进行动态跟踪和控制。
P3 is a project management software that can dynamically trace & control whole project progress.
设计变更、工程量签证、工程进度款支付、审核管理工作;
In charge of design changes, engineering quantity visa, project payment progress and audit management;
如有延误,业主可以指示开发管理人加快工程进度,而非将合同进度延展。
If there is a Delay, rather than grant an extension of the Contract Schedule, the Owner may direct the Development Manager to expedite the Work.
创建追踪管理项目软件。轻松计划和管理项目工程进度等。
With Projector, creating, tracking and managing your projects will be much easier. Projector is design…
创建追踪管理项目软件。轻松计划和管理项目工程进度等。
With Projector, creating, tracking and managing your projects will be much easier. Projector is design…