• 扩建工程费用预计超过50亿美元

    The cost is estimated at more than five billion dollars.

    youdao

  • 两个学校同意分摊建筑工程费用

    The two schools agreed to split the cost of construction between them.

    youdao

  • 并且介绍施工工艺工程费用估价

    And the paper introduces construction technology and estimating fee of island engineering.

    youdao

  • 减少了建设水源工程费用

    To construct a new water source became unnesessary;

    youdao

  • 工程费用不会至乘客身上。 。

    Thee cost of the project will not put any additional pressure on fares.

    youdao

  • 所需供电工程费用应付电费依照国家有关规定执行

    The expenses for power supply project and the charges for electricity utilization payable shall be handled according to the relevant regulations of the State.

    youdao

  • 微灌管网毛管设计,直接影响工程费用灌水质量

    The design of micro-irrigation laterals affects the project cost and irrigated quality.

    youdao

  • 全部设备材料在国内生产制造工程费用比较低。

    All equipment and materials used can be produced domestically and therefore the engineering costs involved are low.

    youdao

  • 但是它们之间存在共同点,旨在控制拟建工程费用

    But, there is also common ground between them, to control the proposed construction project cost.

    youdao

  • 专家认为这样能使得场馆更加安全并且可以节省工程费用

    Experts say that this will make the stadium safer, whilst reducing construction costs.

    youdao

  • 铁轨六个月前完成,(工程费用)比预算低了将近10%。

    It was finished six months early and nearly 10% under budget.

    youdao

  • 为了降低技改工程费用决定轧机现场机架进行扩孔加工

    To reduce the technological transformation project costs, the legislature decided to roll mill site for reaming rack processing.

    youdao

  • 减小节约工程费用引起效应导致现象发生

    Reducing well spacing can economize project cost, but it will cause group pile effect and bring on the phenomenon of repelling hammering.

    youdao

  • 系统方案设计合理运行稳定可靠,可节约工程费用10%以上。

    This design of the system is reasonable and proves to be10% investment saved with stable system operation.

    youdao

  • 此外,我们还会一些工程费用我们世界最低成本中心的。

    And there will be some engineering costs there, but that's in our lowest cost centre in the world.

    youdao

  • 传统的铣刨、加方式相比,现场再生可以节约39.7%的工程费用

    In the hot in place recycling project, 39.7% cost could be saved comparing with milling and repaving method.

    youdao

  • 工程费用开支可分成如下几部分:工资一千万英镑厂房设备四百万英镑。

    Expenditure on the project breaks down as follows: wages 10m, plant 4m, raw materials 5m.

    youdao

  • 石坝水库枢纽工程费用效益研究对于资源优化配置有着重要的意义。

    The research of expenses and benefits of dam reservoir project has a great deal of significance for the Resource Allocation.

    youdao

  • 建筑安装工程费用建设项目重要组成部分也是工程造价控制主要对象

    The construction and installation cost is an important component of a construction project and is also the main object controlled by the whole engineering cost.

    youdao

  • 需要治理防止整体失稳深厚滑坡采用传统抗滑桩施工困难工程费用

    For deep - wide landslide, in order to prevent its whole instability, we find that it is difficult to construct and its engineering expense is higher when using traditional slide -resistant piles.

    youdao

  • 锚杆支护加固质边坡的有效方法技术可行施工方便工程费用较低

    The anchor support is a effective method for reinforcing failure rock slope with technic feasibility, construction convenience and lower cost.

    youdao

  • 清水混凝土采用模板施工,因而建筑构件表面平整,减少装修工程费用工时

    As the construction of rinsing concrete USES the steel template, the component surface than other construction method. Which could decrease the cost and time of decoration engineering.

    youdao

  • 便于工程预算法兰连接节约工程费用地20%,施工无需电源氧气明火

    It's easy for project budget and can save 20% of the total charge compared to flange connecting, the construction don't need the power supply, oxygen, and fire.

    youdao

  • 详细分析铁路卫星通信工程费用特殊探讨了项目实施各个环节如何控制成本

    Special points of the project cost of railway satellite communication are analyzed, and how to control the cost in various links of project implementation is discussed.

    youdao

  • 这样充分发挥岩石地基较高承载能力节省人力资源自然资源降低工程费用

    In this way it can full exert the higher loading ability of the rock ground, save human resource and natural resources, and reduce the project expenses.

    youdao

  • 以往一样,不公平在于那些巨大基础建设工程费用现有客户支付的,受益人却是将来的客户。

    As always, the inequity is that the huge infrastructure projects needed are paid for by existing customers, while future customers reap the benefits.

    youdao

  • 前项土地所有权人分担之工程费用,得土地所有权人提供重划区部分土地折价抵之。

    The construction costs in the preceding paragraph shall be paid with the cost equivalent lands in readjustment area by the landowners.

    youdao

  • 前项土地所有权人分担之工程费用,得土地所有权人提供重划区部分土地折价抵之。

    The construction costs in the preceding paragraph shall be paid with the cost equivalent lands in readjustment area by the landowners.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定