• 我国建设工程计价模式主要定额计价模式清单计价模式

    There are mainly two kinds of pricing models in construction project in china:the pricing mode of construction bill of quantities and fixed pricing model.

    youdao

  • 提高工程造价编制水平必须改变现有计价模式

    In order to improve establishment level of project cost, the present pricing mode must be changed.

    youdao

  • 新的计价模式业主工程造价控制思想方法提出了新的要求。

    The new pricing mode suggests new idea and method for controlling construction cost to owners.

    youdao

  • 工程清单计价作为一种新的计价模式,正在逐步替代以往的定额计价模式这种计价模式变革势必建筑行业产生根本影响

    As a new model of valuation, construction-volume inventory valuation is replacing the traditional quota valuation. This reform will inevitably produce fundamental influence on construction industry.

    youdao

  • 工程清单计价模式投标报价,一个有机构成体系

    Biding under the mode of valuation with bill quantity is an organic system.

    youdao

  • 以下就市场竞争环境工程清单计价模式风险承担展开探讨

    The Risk Taking in engineering bill pricing mode is discussed in the competition market environment.

    youdao

  • 结合工程量清单计价模式特点承包商的角度综合单价风险分析方法进行了阐述

    Based on the characteristics of BOQ (bill of quantities) valuation model, this paper elaborates on the risk analysis method for integrated unit price from the perspective of contractors.

    youdao

  • 我国目前采用工程造价模式是以定额计价基础全过程造价管理模式

    The project cost management model that we're applying now is Whole Process Cost Management model using the ration as the pricing basis.

    youdao

  • 相对于传统定额计价方法工程清单计价方法一种新的计价模式

    The measurement valuation of project quantities bill of building works is a new method of valuation relatively to the traditional method of norm valuation.

    youdao

  • 本文工程清单计价进行了简要分析着重探讨了模式工程造价控制

    In this paper a brief analysis of the bill of quantities, and focused on the project cost control in this mode.

    youdao

  • 本文主要叙述传统定额模式计价工程清单模式计价本质区别联系

    This paper probes into the basic differences and relations of traditional quota pricing method and bill of qualities pricing method.

    youdao

  • 工程清单计价原理内容方法上与原有定额计价模式相比很大差别。

    In principle, content and method, the valuation method of engineering volume list (EVL) is quite different from the previous one which adopted quota valuation mode.

    youdao

  • 工程量清单计价模式工程造价分部分项工程措施项目其他项目费、规费税金等构成。

    When pricing based on bill of quantities, the project cost consists of sub-engineering fee, measure fee, other fee, regulate fee and tax.

    youdao

  • 工程清单计价国际普遍采用计价模式传统定额计价模式计价依据、计价方法指导思想方面有着本质的差别

    Quantity bill is a kind of valuation mode used all over the world, it is constitutionally different with traditional quota valuation mode in valuation ground and method, guidance idea and so on.

    youdao

  • 首先明确了工程清单计价涵义提出不同承包模式下合同计价方式的四种常规表现形式工程量清单计价影响;

    Abstract: Firstly, the implication of BOQ valuation is cleared, four normal expressions of contract valuation and the effection on BOQ valuation are put forward.

    youdao

  • 以往工程项目来看,工程清单计价实践中暴露一些问题,对工程清单计价模式存在几个问题进行探讨

    From the previous project, the engineering bill pricing exposes some problems. The paper explores several existing problems in engineering bill pricing mode.

    youdao

  • 定额计价工程清单计价模式概念,在应用时经常发生混淆,文章通过实例实践总结,从多方面阐述了两种计价模式不同之处。

    This paper defined the concepts of quota valuation and a valuation inventory with amount of works and explained the difference between them through extensive practice.

    youdao

  • 项目实施角度,对工程清单项目构成单价组成进行分析,并探讨了工程量清单的计价模式

    The composing of the project quantity list and unit price are analyzed from the implement of the project, and the model of assessment from project quantity lists is discussed in this paper.

    youdao

  • 为了实现国际接轨必须推广采用工程量清单计价模式

    It is necessary to widespread and adopting valuate mode of engineering list in consonance with international engineering.

    youdao

  • 论文研究工程清单计价模式投标报价模型合作投标报价与合作投标报价两个方面,对投标企业的投标报价进行了深入的研究。

    Bidding price of tender company is more deeply studied more from non-cooperative bidding to cooperative bidding when the bidding model is built based on the bill of quantities.

    youdao

  • 我国加入WTO我国工程造价管理不得不遵循国际惯例采用工程量清单计价模式

    With China having been the member of WTO, the engineering cost management in our country will adopts the bill of quantities mode which is widely used in international bidding.

    youdao

  • [摘要]针对定额计价工程清单计价并存局面,采用图释的方法剖析两种计价模式计价方法和招投标上的区别

    Abstract: According to the co-existence of quota pricing and bill of quantity pricing, analyzes the differences of the two pricing patterns in valuation method and bidding by picture explaining.

    youdao

  • 本文论述了实行工程量清单计价模式重要性及其优越性探讨了它与传统定额计价模式区别联系。

    The paper expounds the importance and superiority of the mode of evaluation with bill of quantity, and discusses the difference and relationship with traditional quota mode.

    youdao

  • 公路工程现行招投标计价方法是以工程清单为基础的计价模式,本质上与作为国家标准的《建设工程工程量清单计价规范一致的。

    Existing valuation method of highway construction works tendering is based on bill of quantity. It is the same as national standard Code of valuation with bill quantity of construction work.

    youdao

  • 提出工程量清单计价模式下的工作重心相比定额计价模式很大的转变。

    The traditional pricing model focuses on measuring according to the pictures and applying the corresponding quota.

    youdao

  • 并且结合工程清单计价模式合理低价中标原则进行投标决策分析

    With principle of reasonable low price for bidding, analysis of bidding decision is made combined mode of BOQ.

    youdao

  • 简要介绍了传统计价模式招标工程量清单招标缺点以及采用工程量清单招标基本要求。

    In this paper the disadvantages of the bidding of traditional valuation mode and the disadvantages of the b...

    youdao

  • 随着工程清单计价模式推广国际惯例招标投标势在必行

    With the bill pricing model projects to promote, in accordance with international bidding practices is imperative.

    youdao

  • [摘要]指出分包合同示范文本修订过程保证修订范本我国现行工程清单计价模式相互协调重点解决三个方面问题,即暂估价项目问题、总承包服务费问题和计日工作问题。

    Abstract: the paper points out that there are three major problems to be solved during the process of revision of the subcontract, to ensure the revised subcontracts model consistent with BOQ methods.

    youdao

  • [摘要]指出分包合同示范文本修订过程保证修订范本我国现行工程清单计价模式相互协调重点解决三个方面问题,即暂估价项目问题、总承包服务费问题和计日工作问题。

    Abstract: the paper points out that there are three major problems to be solved during the process of revision of the subcontract, to ensure the revised subcontracts model consistent with BOQ methods.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定