我国建设工程计价模式主要有定额计价模式和清单计价模式两种。
There are mainly two kinds of pricing models in construction project in china:the pricing mode of construction bill of quantities and fixed pricing model.
提高工程造价编制水平,必须改变现有的计价模式。
In order to improve establishment level of project cost, the present pricing mode must be changed.
新的计价模式给业主的工程造价控制思想及方法提出了新的要求。
The new pricing mode suggests new idea and method for controlling construction cost to owners.
工程量清单计价作为一种新的计价模式,正在逐步替代以往的定额计价模式,这种计价模式的变革势必会对建筑行业产生根本的影响。
As a new model of valuation, construction-volume inventory valuation is replacing the traditional quota valuation. This reform will inevitably produce fundamental influence on construction industry.
工程量清单计价模式下的投标报价,是一个有机构成的体系。
Biding under the mode of valuation with bill quantity is an organic system.
以下就在市场竞争的环境下工程量清单计价模式的风险承担展开探讨。
The Risk Taking in engineering bill pricing mode is discussed in the competition market environment.
结合工程量清单计价模式的特点,从承包商的角度对综合单价风险分析方法进行了阐述。
Based on the characteristics of BOQ (bill of quantities) valuation model, this paper elaborates on the risk analysis method for integrated unit price from the perspective of contractors.
我国目前采用的工程造价模式是以定额为计价基础的全过程造价管理模式。
The project cost management model that we're applying now is Whole Process Cost Management model using the ration as the pricing basis.
相对于传统的定额计价方法,工程量清单计价方法是一种新的计价模式。
The measurement valuation of project quantities bill of building works is a new method of valuation relatively to the traditional method of norm valuation.
本文对工程量清单计价进行了简要分析,并着重探讨了该模式下工程造价的控制。
In this paper a brief analysis of the bill of quantities, and focused on the project cost control in this mode.
本文主要叙述传统定额模式计价与工程量清单模式计价的本质区别与联系。
This paper probes into the basic differences and relations of traditional quota pricing method and bill of qualities pricing method.
工程量清单计价法从原理、内容及方法上与原有定额计价模式相比有很大差别。
In principle, content and method, the valuation method of engineering volume list (EVL) is quite different from the previous one which adopted quota valuation mode.
在工程量清单计价模式下工程造价由分部分项工程费、措施项目费、其他项目费、规费和税金等构成。
When pricing based on bill of quantities, the project cost consists of sub-engineering fee, measure fee, other fee, regulate fee and tax.
工程量清单计价是国际普遍采用的计价模式,和传统定额计价模式在计价依据、计价方法和指导思想等方面有着本质的差别。
Quantity bill is a kind of valuation mode used all over the world, it is constitutionally different with traditional quota valuation mode in valuation ground and method, guidance idea and so on.
首先明确了工程量清单计价的涵义,提出不同承包模式下合同计价方式的四种常规表现形式及对工程量清单计价的影响;
Abstract: Firstly, the implication of BOQ valuation is cleared, four normal expressions of contract valuation and the effection on BOQ valuation are put forward.
从以往的工程项目来看,工程量清单计价在实践中暴露出一些问题,对工程量清单计价模式及存在的几个问题进行探讨。
From the previous project, the engineering bill pricing exposes some problems. The paper explores several existing problems in engineering bill pricing mode.
定额计价与工程量清单计价模式的概念,在应用时经常发生混淆,文章通过实例和实践总结,从多方面阐述了这两种计价模式的不同之处。
This paper defined the concepts of quota valuation and a valuation inventory with amount of works and explained the difference between them through extensive practice.
从项目实施的角度,对工程量清单的项目构成、单价组成进行分析,并探讨了工程量清单的计价模式。
The composing of the project quantity list and unit price are analyzed from the implement of the project, and the model of assessment from project quantity lists is discussed in this paper.
为了实现与国际接轨就必须推广采用工程量清单计价模式。
It is necessary to widespread and adopting valuate mode of engineering list in consonance with international engineering.
论文在研究工程量清单计价模式下的投标报价模型时,从非合作投标报价与合作投标报价两个方面,对投标企业的投标报价进行了较深入的研究。
Bidding price of tender company is more deeply studied more from non-cooperative bidding to cooperative bidding when the bidding model is built based on the bill of quantities.
我国已加入WTO,我国的工程造价管理将不得不遵循的国际惯例采用工程量清单计价模式。
With China having been the member of WTO, the engineering cost management in our country will adopts the bill of quantities mode which is widely used in international bidding.
[摘要]针对定额计价和工程量清单计价并存的局面,采用图释的方法剖析两种计价模式在计价方法和招投标上的区别。
Abstract: According to the co-existence of quota pricing and bill of quantity pricing, analyzes the differences of the two pricing patterns in valuation method and bidding by picture explaining.
本文论述了实行工程量清单计价模式的重要性及其优越性;探讨了它与传统的定额计价模式的区别与联系。
The paper expounds the importance and superiority of the mode of evaluation with bill of quantity, and discusses the difference and relationship with traditional quota mode.
公路工程现行的招投标计价方法是以工程量清单为基础的计价模式,本质上与作为国家标准的《建设工程工程量清单计价规范》是一致的。
Existing valuation method of highway construction works tendering is based on bill of quantity. It is the same as national standard Code of valuation with bill quantity of construction work.
提出,工程量清单计价模式下的工作重心相比定额计价模式有了很大的转变。
The traditional pricing model focuses on measuring according to the pictures and applying the corresponding quota.
并且结合工程量清单计价模式下合理低价中标的原则进行了投标决策分析。
With principle of reasonable low price for bidding, analysis of bidding decision is made combined mode of BOQ.
简要介绍了传统计价模式招标和工程量清单招标的缺点以及采用工程量清单招标的基本要求。
In this paper the disadvantages of the bidding of traditional valuation mode and the disadvantages of the b...
随着工程量清单计价模式的推广,按国际惯例招标投标势在必行。
With the bill pricing model projects to promote, in accordance with international bidding practices is imperative.
[摘要]指出在分包合同示范文本修订过程中,为保证修订范本与我国现行工程量清单计价模式相互协调,要重点解决三个方面的问题,即暂估价项目问题、总承包服务费问题和计日工作问题。
Abstract: the paper points out that there are three major problems to be solved during the process of revision of the subcontract, to ensure the revised subcontracts model consistent with BOQ methods.
[摘要]指出在分包合同示范文本修订过程中,为保证修订范本与我国现行工程量清单计价模式相互协调,要重点解决三个方面的问题,即暂估价项目问题、总承包服务费问题和计日工作问题。
Abstract: the paper points out that there are three major problems to be solved during the process of revision of the subcontract, to ensure the revised subcontracts model consistent with BOQ methods.
应用推荐