摘要]工程竣工阶段是工程建设的最后阶段又是工程最终造价的形成阶段,竣工结算审核是造价控制的关键。
Abstract: Project cost control runs through the whole process of engineering construction, the completion phase is a key of control of cost.
整个工程项目的过程一般分为投资决策、设计、施工(包括招投标)、竣工决算等几个阶段。
The entire engineering project process divides into the investment decision-making, the design, the construction generally (including incurs bid), completion final accounts and so on several stages.
工程管理贯穿于工程施工到竣工的各个阶段,在工程施工的全过程中,进行计划、组织、指挥、协调和控制。
Project management through the engineering construction to the stages of completion, in the whole process of engineering construction, planning, organizing, directing, coordination and control.
论述了从初步设计到工程竣工验收各个阶段工程建设的造价控制。
It is discussed how to control the cost of a project in its various stages from the beginning of design to the cheeking before acceptance.
从项目决策阶段、设计阶段、招投标阶段、施工阶段,竣工结算阶段等几个方面对建设工程造价控制做了介绍。
The paper introduces how to control the cost of construction works from item decision-making phase, design phase, tender phase, construction phase and settlement phase.
水利工程建设项目都需经历项目决策、设计、施工和竣工验收等几个阶段。
The construction of water project need to go through project decision, design and construction with is completed check and accept.
本文对工程施工和竣工结算阶段工程造价控制进行了探讨。
This paper discusses construction project cost control on cost control in the stage of construction and completion settlement.
造价控制贯穿于工程项目建设的全过程,阐述了设计阶段、招标投标阶段、施工阶段和竣工阶段控制工程造价的措施。
Cost control runs through the whole process of construction projects. The cost control measures of design phase, bidding phase, construction phase and completion phase of construction are described.
从设计阶段、投标阶段、施工阶段、竣工结算阶段阐述了造价监理工程师在监理工作中的地位和作用,并明确了造价监理工程师在各个阶段的责任。
From the different stages — designing, bidding, constructing and settling accounts, discussion is made on the status and function of a costing and supervising engineer.
【摘要】工程量清单计价模式下在工程招标、施工阶段和竣工结算中成本控制重点和方法。
The project, under BOQ tenders for the construction phase and completion of settlement in focus and methods of cost control.
天然边坡在削坡工程施工阶段或竣工后,往往形成上下部不同坡度的边坡。
During or after cutting of natural slopes, different gradients of slopes are usually formed on the upper part and the lower part.
天然边坡在削坡工程施工阶段或竣工后,往往形成上下部不同坡度的边坡。
During or after cutting of natural slopes, different gradients of slopes are usually formed on the upper part and the lower part.
应用推荐