设计变更是造成工程概算突破的重要环节。
Design alterations are an important link to occasion the breakthrough in construction estimate.
工程造价管理人员必需努力学习专业技术知识才能提高工程概算的正确性。
For increasing its correctness, the engineering cost operating personnel must learn hard the specialized technical knowledge.
最后,本文设计了一个土建工程概算数据挖掘系统,通过分析系统的模块功能、用例图和数据流程,提出采用基于ASP。
Through analyse system's blocking function, use case diagram and data flow, we bring forward a B/S triple layers system which is based on ASP.
以“跨行业数据挖掘过程标准”(CRISP-DM)为指导准则,从商业的角度将土建工程概算的数据挖掘过程分6个阶段有效的执行。
Take CRISP-DM as guide principle, we divide data mining into 6 steps from business perspective. At last, this text desighned a data mining system for civil engineering estimation.
本文通过一定数据及现象,从中找出超工程概算的主要原因及从几个方面叙述怎样合理调整工程概算的方法步骤,使读者对整个调概过程一目了然。
This article examines main reasons to lead to the excess in engineering estimation during engineering construction, puts forwards way to reasonably adjust engineering estimation from several aspects.
概算定额是确定一定计量单位扩大分部分项工程的人工、材料和机械消耗数量的标准。
The budgetary estimate fixed quantity is the determination certain measuring unit expands the branch sub-item project the man-power, the material and the machinery consumption quantity standard.
摘要:水利工程设计概算必须依据设计工程量、施工组织设计,按概算编制规定及概算定额进行编制。
Abstract: Hydraulic engineering design budget must be based on the design engineering, construction management planning, budget preparation and budget quota.
工程建设期间如遇概算调整,则设计费也应做相应调整。
During the construction of this project, if there is any adjustment in budgetary estimate, the design fee will also be adjusted correspondingly.
从分析概算编制,及其前、后期几个方面的工作出发,对如何提高海上石油工程项目概算质量进行了探讨。
Analysis the several aspects work about pre-and post-budget, to discuss how to improve the budget quality of offshore oil engineering project.
对现行《铁路基本建设工程设计概算编制办法》中综合电价的应用,做了进一步探讨。
Besides, a further study is also made into the application of the existing Estimate Making for Engineering Design of Railway Capital Construction Projects.
铁路基本建设工程的设计概算编制软件,是提高设计概算编制质量的重要手段。
Design budget estimate making software for railway capital construction projects, is an important method to improve the quality of budget estimate.
针对工程造价超概算问题,本人认为设计是关键,通过限额设计可以控制工程造价。
In view of over estimate budget in engineering cost, the author thinks that design is the key, and quota design is the best way of control engineering cost.
影响铁路工程设计概算准确性的一个重要原因,就是各专业的工程量计算是否准确。
It is an important reason to affect the accuracy of railroad engineering design estimate whether the bill of quantities calculation of all specialties is accurate.
这个计划文件所确定的每项工程投资额,实际上也就是该工程的计划价格,即概算造价或预算造价。
The plan document sure every project investment and, in fact, is the project plan price, namely the cost budget estimates or budget cost.
从风险意识、组织结构、科学概算、技能培训四个方面下手提出解决水利工程项目风险管理困境的对策。
There are four areas to continuously improve risk management as follows:risk awareness, organizational structure, scientific estimates, skill training.
协助我司相关规划设计项目、景观工程项目中土建、安装、绿化的概算、预算及结算。
Help planning and design projects, landscape projects in civil engineering, installation, Green estimates, the budget and settlement.
协助我司相关规划设计项目、景观工程项目中土建、安装、绿化的概算、预算及结算。
Help planning and design projects, landscape projects in civil engineering, installation, Green estimates, the budget and settlement.
应用推荐