• 审核跟进工程更改

    Review and follow engineering changes.

    youdao

  • 控制工程更改物料库存,避免过剩物料新旧物料有序导入。

    Control ECN for EOL materials or other excess stocks and phase-in materials.

    youdao

  • EWO流程上汽通用五菱汽车股份有限公司工程更改签署电子流程。

    EWO process is one of signing process for engineering changing in SGMW Automotive Co.

    youdao

  • 参与产品部门提出的工程更改项目的技术讨论,负责模具改造的供应商选择实施。

    Participate in technical discussion on ECN, select die supplier for die changes and track the change.

    youdao

  • 深入分析汽车零部件产品工程更改风险因素建立了工程更改风险因素分析模型

    By analyzing the risk factors in the engineering change process of the automotive components, this paper establishes the analysis models of the risk factors in the engineering change processes.

    youdao

  • 作为长安福特产品工程源头的联络窗口, 工程更改控制和WERS问题处理 过程中确保 工程更改顺利导入和进行

    Act as the interface between ChangAnFord(CAF) and the Engineering Source(s) on ECC and WERS concern process, to ensure smooth progression and introduction of changes.

    youdao

  • 分析虚拟企业更改控制特点基础上,研究了跨企业更改建议发起协商机制给出了虚拟企业进行工程更改应遵循的原则提出了虚拟企业进行工程更改集成框架模型

    The mechanism of initiation and negotiation of change proposal among the ve was investigated, the principle for ECC in the ve was provided, and an integrated framework model for ECC was proposed.

    youdao

  • 一旦更改编译器遵从设置需要重新构建工程下面8所示。

    Once you change the compiler compliance Settings, you will have to rebuild your project, as seen below in Figure 8.

    youdao

  • 更改控制管理可以提供灵活性,同时有助于实现严谨工程原则

    Change control management allows for flexibility, and at the same time, promotes disciplined engineering principles.

    youdao

  • 有限制的暂停时间减少源于收集方法增加细致工程决断包括VM的基本更改

    The reduced bounded pause times result from an incremental approach to collection and careful engineering decisions that include fundamental changes to the VM.

    youdao

  • 传统需求工程允许实现需求之后整合新的更改

    Traditional requirements engineering doesn't let you incorporate new changes after you implement the requirements.

    youdao

  • 这次修正英国国家统计局有史以来最大一次修正原因工程及服务业估计的有更改

    The revision is one of the biggest ever made by the ons and it said the reasons were changes to its estimate of the construction and services sectors.

    youdao

  • 如果尚未尝试的话,发现更改很多CSS的话,重新装载每个页面将是一个巨大工程

    If you hadn't tried it, it may not seem like a big deal to reload a page on every CSS change... until you've made a few hundred of them.

    youdao

  • 应用程序中的更改包括现有应用程序工程创建的应用程序中的设计更改

    Changes in applications, including reengineering of existing applications and design changes in applications to be created.

    youdao

  • 更正本文最初乔布斯周末打电话给苹果工程,要更改图标颜色,那名工程师实际上是谷歌工程师。

    Correction: the engineer Steve Jobs called one weekend to correct the colour of a logo worked at Google, not Apple, as originally stated in this article.

    youdao

  • 因此弹性工程可能需要增加现有系统容量相应更改操作过程

    As such, the Resilience Engineer may need to increase the capacity of the existing systems and alter their operational procedures accordingly.

    youdao

  • 这个屏幕快照中个针对分线附件(工程这个附件就绪填充)一个针对这个更改请求项目计划附件。

    In the screenshot there is an attachment for the die line (the engineer will populate this attachment when it is ready) and an attachment for the project plan for this change request.

    youdao

  • 他们提交承包商工程所有这些人都会请求更改,所有这些更改(如果可见至少影响成本或进度)客户同意

    They're submitted to contractors and engineers, all of whom request changes, all of which (if they're visible, at least, or affect cost or schedule) are run by the client.

    youdao

  • 合同工程履约之间签署书面协议及其所有附件包括各方共同同意更改补充文件

    "Contract" shall mean the written agreement between the parties concerning performance of the Works, and all appendices, including agreed amendments and additions to the said documents.

    youdao

  • 电气设计估计电气工程项目更改总体指导的项目工程

    Electrical design and estimating of electrical works of project variation order under the general direction of project engineer.

    youdao

  • 铁路车站道岔选择咽喉区布置不仅运营效果影响很大而且桥隧工程一样更改

    The selection of switch and throat arrangement has great impact on the operation efficiency and is unchangeable like bridge and tunnel engineering.

    youdao

  • 每一个工程技术更改必须技术部正式文件及时通知质量生产材料部门。

    Engineering Dept. must inform each engineering change with formal documents to Quality Dept. Production Dept. and Material Dept. timely.

    youdao

  • 但是工程更改必须经过设计人员批准以保证不会损伤产品功能

    But, in the project change must have to pass through designs the personnel to authorize, guaranteed cannot damage the product the function.

    youdao

  • 如果知道项目工程使用一个特定数据库而且不会更改的话,我提倡使用存储过程

    Personally, I would like to go in for stored procedures and leverage most of the database capabilities if I knew my project was going to use a specific database and wouldn't change.

    youdao

  • 供水管网一项不断变迁更改工程没有最终模式

    Water supply network is an ever-changing, changing the project, there is no final model.

    youdao

  • 依照第25款规定买方有权工程交付使用要求工程工作范围设计建造进行更改

    Subject to the provisions of Clause 25, the Purchaser is entitled to require variations to the scope, design and construction of the Works until the Works have been taken over.

    youdao

  • 承包商应对永久工程任何更改修改除非直到工程发出指示同意变更

    The Contractor shall not make any alteration and/or modification of the Permanent Works, unless and until the Engineer instructs or approves a Variation.

    youdao

  • 承包商应对永久工程任何更改修改除非直到工程发出指示同意变更

    The Contractor shall not make any alteration and/or modification of the Permanent Works, unless and until the Engineer instructs or approves a Variation.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定