作为长安福特和产品工程源头的联络窗口,在 工程更改控制和WERS问题处理 过程中确保 工程更改的顺利导入和进行。
Act as the interface between ChangAnFord(CAF) and the Engineering Source(s) on ECC and WERS concern process, to ensure smooth progression and introduction of changes.
更改控制管理可以提供灵活性,同时有助于实现严谨的工程原则。
Change control management allows for flexibility, and at the same time, promotes disciplined engineering principles.
控制工程更改物料库存,避免过剩物料和新旧物料有序导入。
Control ECN for EOL materials or other excess stocks and phase-in materials.
在分析虚拟企业更改控制特点的基础上,研究了跨企业间更改建议的发起与协商机制,给出了虚拟企业进行工程更改应遵循的原则,提出了虚拟企业进行工程更改的集成框架模型。
The mechanism of initiation and negotiation of change proposal among the ve was investigated, the principle for ECC in the ve was provided, and an integrated framework model for ECC was proposed.
在分析虚拟企业更改控制特点的基础上,研究了跨企业间更改建议的发起与协商机制,给出了虚拟企业进行工程更改应遵循的原则,提出了虚拟企业进行工程更改的集成框架模型。
The mechanism of initiation and negotiation of change proposal among the ve was investigated, the principle for ECC in the ve was provided, and an integrated framework model for ECC was proposed.
应用推荐