• 本文讨论GPS工程控制最优化设计问题

    In this paper, the problems on best optimum design of GPS Engineering control network are discussed.

    youdao

  • 结合重力测量介绍利用GPS技术进行东海大桥跨海工程控制布设技术方案

    With reference to the gravity survey, this paper describes the schemes of control network layout used with global positioning system (GPS) technique for Donghai Bridge project over sea.

    youdao

  • 同意工程控制间距系数直接折算各个级别储量勘查成本费用

    But he disagrees with the method of directly assessing the costs according to the coefficients of the controlled distances in exploration engineering.

    youdao

  • 中海壳牌南海石化项目工程建设需要厂区范围内建立了四个永久性水准点作为场地高程控制

    The four permanent benchmarks are built as the altitude control network in the place because of the requirement for the CSPC Nanhai petrochemical project's building.

    youdao

  • 中海壳牌南海石化项目工程建设需要厂区范围内建立了四个永久性水准点作为场地高程控制

    The four permanent benchmarks are built as the altitude control network in the place because of the requirement for the CSPC Nanhai petrochemical project's building.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定