负责交通基本建设工程质量监督和交通工程定额管理。
to be responsible for quality supervision of transport infrastructure project and management of traffic engineering scale.
系统介绍了建筑工程定额原理与概预算课程建设的过程。
The essay systematically introduces the process of the curriculum construction.
概算定额是确定一定计量单位扩大分部分项工程的人工、材料和机械消耗数量的标准。
The budgetary estimate fixed quantity is the determination certain measuring unit expands the branch sub-item project the man-power, the material and the machinery consumption quantity standard.
我们使用该系统能方便完成工程概预算文件的编制、打印与归档保存,以及各类建筑定额的维护操作。
We can edit , print and save engineering budget and budgetary estimate , and maintain various construction project quota by this system.
摘要:水利工程设计概算必须依据设计工程量、施工组织设计,按概算编制规定及概算定额进行编制。
Abstract: Hydraulic engineering design budget must be based on the design engineering, construction management planning, budget preparation and budget quota.
实行稀缺资源定额管理制度,是一项复杂的系统工程。
Putting into effect scarce resources to quota management system is a complicated ystem engineering.
实行稀缺资源定额管理制度,是一项复杂的系统工程。需要社会各种力量广泛的协调、配合、支持。
The implementation of the society quota management of the scarce resources is a complex system engineering and needs extensive coordination, cooperation and support of various social forces.
并利用现有的部颁预算定额,通过分析计算,确定钢桥面铺装的工程造价。
It also discusses how to determine the project cost through analysis and calculation by (utilizing) the existing Budget Quota issued by the Construction Department.
本文介绍了土建工程预决算系统的编制方法,包括预算定额库及材料单价库建立方法及一些问题的处理,并介绍在编制预决算时出现的各种各样的换算及程序设计框图。
This paper introduces a method of making the budget and balance account of civil engineering system, including making the quota store of budget and the price store of materials.
由于地质灾害防治工程没有定额及计量规则等,致使其造价管理存在许多问题。
Many problems in cost management are caused by the fact that there are no quotas and measurement rules on geological disaster prevention project.
此方法可应用于工程项目建设工期定额的修订与完善,以及建设工期定额的执行和建设工期的决策与管理。
This method may use in revision and perfection of quota in completion time of project, and use in the decision and management of completion time of project.
工程量清单计价作为一种新的计价模式,正在逐步替代以往的定额计价模式,这种计价模式的变革势必会对建筑行业产生根本的影响。
As a new model of valuation, construction-volume inventory valuation is replacing the traditional quota valuation. This reform will inevitably produce fundamental influence on construction industry.
工程量清单计价法从原理、内容及方法上与原有定额计价模式相比有很大差别。
In principle, content and method, the valuation method of engineering volume list (EVL) is quite different from the previous one which adopted quota valuation mode.
厨房也经过翻修,同时限定额外的工程费:用新材料和高凳覆盖原有橱柜。
The kitchen was also revamped while limiting the additional cost of work: covering of existing cupboards with new materials and creation of high benches.
作者通过工程实例,论述了熟悉和掌握预算定额的内容形式和使用方法,对于准确、完整的编制施工图预算具有重要意义。
Author discusses the use method of building engineering budget ration with example in the engineering. It has important significance for working drawing budget being workout exactly and completely.
分析了电力工程中定额管理的自身特点及内在规律,阐述了在定额管理中使用计算机的必要性和重要性。
The self characteristic and internal regularity of quota management is analysed in power engineering, and stated as well as necessity and importance.
定额计价与工程量清单计价模式的概念,在应用时经常发生混淆,文章通过实例和实践总结,从多方面阐述了这两种计价模式的不同之处。
This paper defined the concepts of quota valuation and a valuation inventory with amount of works and explained the difference between them through extensive practice.
本文就建设工程预算定额套用中几个常见的问题进行了探讨。
This paper discusses several common problems in the application of engineering budget quotas.
桩基法介绍了灰土桩、砂桩、碎石桩的适用范围,采用冶金建设工程预算定额的有关定额进行了技术经济分析。
And then make an analysis to their technology and economy based on the railway estimate norm and metallurgy engineering estimate norm.
阐述工程设计阶段进行优化设计和造价控制的重要性,并对工程建设概预算定额及计价依据进行分析。
Importance of optimization design and cost control during the design stage of a project is put forward. Project budget rating and pricing basis are also analyzed.
通过定额法与实物量法的比较分析,两者对水利水电工程造价管理具有一定的指导意义。
Based on the comparison and the analysis of the norm method and the real object quantity method, they have the merit and defect in the work cost management of hydraulic and hydroelectric projects.
介绍了实物法确定工程造价的方法,并对现行定额单价法的不足作了分析,阐述了实物法确定工程造价的优越性,提出编制预算具体的工作步骤。
With analysis on the disadvantages of current norm unit price method the advantages of the real object method are elaborated as well as concrete operation in budget making.
介绍了一款工程造价管理软件的开发过程,阐述了如何根据定额、价格等数据计算出工程的预算经费。
This paper introduced the development process software of one management software of construction costs, and discussed how to compute the construction budget by using norm, price and so on.
通过具体工程实例,探讨了运用预算定额完成工程量清单报价的方法。
Through several engineering examples, this paper probes into the methods for fulfilling the quotation of quantities bill using the budgetary norms.
采取静态控制、动态管理,提高设计产品质量,补充地方定额等措施来防止水利工程造价的失控。
Some measures such as static control of quota, dynamic management of price, improving of quality of design products, and supplementing of provincial quota are given.
摘要:建筑工程与修缮工程的消耗量定额不能完全适用于旧工业建筑改造工程计价。
Abstract: Consumption quota of architectural engineering and restoration project are not entirely suitable for the old industrial buildings renovation project valuation.
本文阐述了工程量清单计价的特点和重要性以及工程量清单计价与传统定额计价的区别。
It also point out the difference of counting on engineering quantity and the traditional counting on norm.
我国目前采用的工程造价模式是以定额为计价基础的全过程造价管理模式。
The project cost management model that we're applying now is Whole Process Cost Management model using the ration as the pricing basis.
提出,工程量清单计价模式下的工作重心相比定额计价模式有了很大的转变。
The traditional pricing model focuses on measuring according to the pictures and applying the corresponding quota.
提出,工程量清单计价模式下的工作重心相比定额计价模式有了很大的转变。
The traditional pricing model focuses on measuring according to the pictures and applying the corresponding quota.
应用推荐