• 介绍了昆明勘测设计研究院景洪水电站建设中的工程地质勘察实践,总结了个人在工作过程中的一些体会经验。

    The good effectiveness of the engineering geological exploration works has been achieved with small working quantity and in a short exploratory period.

    youdao

  • 同时也论述到工程地质工作特别水坝建设铁路新线勘测以及灾害地质方面,所取得重要成就。

    On the other hand, it also mentions the chief results of the engineering geological works especially related to dam constructions and new railway line surveys as well as hazard geology.

    youdao

  • 研究目的胶州湾隧道穿越海底断层破碎工程地质勘察手段局限性,决定勘测阶段的地质资料不足。

    Research purposes: Jiaozhou Bay Tunnel is needed to cross the seabed fault zone, but a little survey geological data are obtained because of the means limitation of engineering survey.

    youdao

  • 研究目的胶州湾隧道穿越海底断层破碎工程地质勘察手段局限性,决定勘测阶段的地质资料不足。

    Research purposes: Jiaozhou Bay Tunnel is needed to cross the seabed fault zone, but a little survey geological data are obtained because of the means limitation of engineering survey.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定