继而提出加强公路建设项目工程变更管理的控制策略。
And then strengthening the management of road construction projects engineering change control strategy is proposed.
低成本地增强制造过程、不合格品和工程变更管理的无纸化报告;\ n ?
Cost effectively enhance paperless reporting for manufacturing, nonconformances and Engineering Change management.
工程变更管理是一个动态管理过程,这一过程控制的关键在于建设单位。
Changing construction is a dynamic management process and the key point for project control is the constructor.
然而,传统的工程变更管理模式是等变更事件发生后再采取措施,这往往不能起到很好的效果。
So How to manage the engineering change is attached highly importance to. But just realizing this is not enough because it will be late when the engineering change is happened.
建立在产品数据管理系统基础上的工程变更管理是指管理处于预发布和发布生命周期状态的产品数据。
Engineering change management, which is basis on product data management (PDM) system, controls the pre-released and released product data.
作为一个小组,版本工程学在变更管理领域具备丰富的经验。
As a group, Release Engineering has tremendous experience in the area of Change Management.
将版本工程学团队打造为变更管理处理过程的监护人。
Make the Release Engineering team the clear keepers of the change management process.
与变更请求联合的工作流程应该加强这个过程,通过这个工程您地组织就可以跟踪并管理变更。
The workflow associated with a change request should enforce the process by which your organization intends to track and manage change.
正如前面所讨论的那样,一家版本工程学公司的首要职责就是管理变更的流程。
As previously discussed, a Release Engineering organization's primary responsibility is managing the flow of change through the larger corporation.
然而,为了获得良好的需求,我们需要做很多工作,像需求工程或者变更管理等等。
However, to obtain good requirements, requires several activities such as requirements engineering or change management.
管理监督工程变更的执行。
需求及其变更管理是整个信息系统工程开发过程的基础,也是项目成功的关键因素之一。
Management of requirement and its change is the base of the whole developing process of information system project and one of the critical success factors of the project.
在工厂变更管理系统中接收工程变更,确认无误后启动相应的变更流程。
Receiving change information in plant change management system, initiate running change implementation process when all query identified.
发起和管理工程/图纸变更来满足顾客的需求,优化产品设计、降低成本。
Initiate and manage engineering/drawing changes to meet customer needs, improve product design, or reduce cost.
负责工程变更编号的发放与管理,工程变更的状态跟踪及文件存档;
Engineering change management. To register EC No. , track status and record the document.
本文介绍了与工程造价相关的工程计量签证、工程变更及竣工结算审核几个环节的相关管理。
This paper introduces the management of such links as project measurement verification, project alteration and completion audit relating to engineering project cost,.
从不同方面论述加强公路工程的变更管理、控制公路工程的变更的策略,达到工程预期的目标。
Enhancing highway projects change management, controlling the strategy of highway engineering changes from different aspects are discussed to achieve the desired project objectives.
工程变更与索赔,是在工程实施阶段的风险管理工作中的重要内容。
Project alteration and the claim for compensation are major questions in the risk management in project construction.
工程变更是指由于设计文件或技术规范修改而引起的合同变更,它对工程造价管理工作有较大的影响。
The change of project refers the changes of contract caused by the modification of design document or technical specifications, which has great impact on the work of project cost management.
而建设项目工程变更控制过程中,工程变更方案的技术经济评价是建设项目工程变更控制管理的重要环节。
The technology economic evaluation of construction change plan is the important link of construction project change management in the process of construction project change control.
根据工程总承包项目费用变更的特点,介绍了费用变更的分类,论述了加强费用变更管理的措施。
The classification of cost changes and measures to strengthen cost change control are described based upon the special features of cost changes in EPC projects.
当前的信息工程监理忽视了需求管理的必要性,在信息工程监理中主要做好系统分析、文档审核、需求变更的管理等工作。
The task expatiates the importance of the requirement management, and the job tasks of the system analysis, the document auditing and the requirement changing.
一般由工程部决定ecn,没有工程变更要求管理系统。
It is up to only Engineering to decide for ECN. No systematic ECR feedback.
工程成本控制主要是放在内部管理上,特别是直接工程费和工期的有效控制,其次外部的市场因素和施工阶段的变更索赔也是着重考虑的一个方面。
The top emphasis of the project cost control should be placed on internal management, especially on the effective control of the direct cost and construction period.
而软件工程过程RUP采用面向对象的方法,在需求管理、分析设计、配置及变更管理等方面为开发人员提供准则和相应的管理工具。
Software engineering process RUP adopts the orient-object method, and it provides appropriate rules and tools in demand management, analysis designing, configuration and changing management for users.
第三条各级交通主管部门应当加强对公路工程设计变更活动的监督管理。
Article 3 the competent department of communications at each level shall strengthen its supervision and administration of the highway project design modification activities.
设计变更、工程量签证、工程进度款支付、审核管理工作;
In charge of design changes, engineering quantity visa, project payment progress and audit management;
在这个较长的建设周期内,工程变更被认为是导致项目工期延迟和费用超支的主要原因,在工程建设项目管理过程中倍受重视。
During the long period, It is believed that the mainly reason is the engineering change which results in schedule delay and cost overruns of the construction project.
在这个较长的建设周期内,工程变更被认为是导致项目工期延迟和费用超支的主要原因,在工程建设项目管理过程中倍受重视。
During the long period, It is believed that the mainly reason is the engineering change which results in schedule delay and cost overruns of the construction project.
应用推荐