• 随机网络不仅可以解决桥梁施工计划工期优化问题而且合理工期限定资源条件下,可进行施工成本优化

    The GERT network can solve not only the project time optimization problem in making bridge construction plan, but also the cost optimization in the limit of proper project time and resource.

    youdao

  • 提出通过计算工序优先系数方法进行资源限定实现最短工期优化,使类型的优化从定性优化变成了定量优化该类型的优化提供了一个新的求解思路。

    This paper puts forward an optimum method by computing the priority coefficient of each working procedure to limit resources and implement the optimization of the shortest time limit for a project.

    youdao

  • 经过排水固结经济分析排水固结过程中的强度分析,提出参数及加载计划(工期)的优化设计方法。

    By Analyzing the economy for consolidation and the strength of soft clay during consolidation, the optimal design of the parameters of sand well and the loading schedule (project term) is proposed.

    youdao

  • 本文应用运筹学中的网络优化理论和方法发电企业设备大修管理进行优化缩短工期降低消耗平衡资源

    In this paper, the author try to use Network Optimization Method to optimize the management of the great-prepares in power plant, so as to shorten time, reduce consumes and balance resource.

    youdao

  • 最后模糊决策网络计划工期—成本优化方法进行探讨

    At last, it studies the fuzzy duration-cost optimization of decision network planning.

    youdao

  • 本文基于可靠性分析方法,参考电厂调试经验,采用逻辑分析图优化调试工期方法进行了分析

    Based on the commissioning lessons in various plants and reliability centralized analysis, the paper analyzes the approaches to optimize the time limit of commissioning with logic diagram.

    youdao

  • 如何成本工期质量安全进行全面优化管理施工项目目标集成管理所提出的又一挑战

    How to carries on the comprehensive optimization and the management of cost, time, quality and security, is another challenge to the integrated management of construction project objects.

    youdao

  • 作为施工项目主要目标成本工期质量优化管理一直工程管理界悬而未决问题

    As the essential objects of construction project, the optimized management of cost, time and quality has been the unresolved question of project management.

    youdao

  • 本文工程变更原因意义控制程序、变更工期价格处理原则施工方案优化进行了较为详尽的论述。

    The paper detailed discusses the cause, meaning, controlling program, the dealing principle of time limit for a project and cost of change in the work, and discussing construction scheme optimum.

    youdao

  • 提出了如果需要达到优化压缩目的需要预测整个项目工期的问题,第四章的研究提出要求

    Besides, it lodges that, to reach the aim of optimizing compress, there needs to forecast the best total time for an entire project, bringing forward a request for study of chapter four.

    youdao

  • 当前对于项目进度优化研究集中最小资源增量,实现既定优化工期

    The current studies on schedule optimization aim at achieving the optimal goals by least additional resources.

    youdao

  • 文章算法应用计划调度的工期-费用优化问题之中,得到一种精确全面求解效率高优化方法

    The paper applies ant colony algorithm to network planning time-cost optimization problems, thereby getting a accurate, comprehensive and efficient solution optimization method.

    youdao

  • 介绍公路工期—成本优化思路方法提出了公路工程工期—成本优化CAD软件设计方案

    This article introduces the thought and method of highway engineering time-cost optimization, and puts forward the CAD software design scheme.

    youdao

  • 根据龙滩电厂扩建工程特点设计了工程建设优化方案,确保了工期目标。

    In accordance with the characteristics of expansion project of Huanglongtan Power Plant, the optimized plan for the construction was designed and the project time schedule was guaranteed.

    youdao

  • 方法有助于快速找出可能影响到核电厂调试工期因素进而采取有效措施调试工期进行优化

    This will help the plants to realize the aspects which affect the time limit of commissioning quickly. Then effective measures to optimize the time limit of commissioning can be found.

    youdao

  • 本文提出利用列表逐步进行修改,最终得到工期成本优化问题最优的方法。

    This paper introduce the optimal solution to the problem of optimizing time and cost by setting up a tableau and modifying the tableau step by step.

    youdao

  • 文章选取工程项目常用网络图工期成本压缩优化说明如何运用技术方法工期成本进行优化

    This articles selects the optimization method of cost compression that commonly used in the project to illustrate how to use technical methods to optimize the cost of the construction period.

    youdao

  • 通过此次优化设计缩短工程建设工期半年多,节省了一亿资金取得良好社会经济效益

    The project construction time limit is cut short to over six months, near 100 million Yuan fund is saved and good social and economic benefit is obtained according to this optimization design.

    youdao

  • 探讨工程成本时间曲线非线性,成本与工期优化问题

    The problems of optimizing cost and project time limit occur when the curve of the project cost and project time is nonlinear.

    youdao

  • 指出这种优化方法尽管实现工期最短无法保证资源分布的最优效果。

    It points out that this method may meet the shortest time limit but could not ensure the optimum resource distribution.

    youdao

  • 通过合理优化施工方案缩短建井总工期131

    Based on reasonable construction plan, shorten construction time 131 days.

    youdao

  • 工程施工安全质量费用工期的综合优化许多情况下需要涉及权重确定权重很难精确确定,具有不确定性。

    Weighted value of safety quality cost time in most cases must be regarded for trade-off optimization, but it is difficult to be determined for its uncertainties.

    youdao

  • 进度计划优化方法方面,仅以“工期-成本优化”为例,线形规划方法建立求解模型

    As to optimization of the network technique, make emphasis on "time-cost optimization" and set up mathematic model using Linear Scheduling method.

    youdao

  • 本文对网络计划时间费用优化寻求最优工期的问题,提出了一种改进优化方法

    This article gives a improved method of seeking for optimum time-cost in CPM.

    youdao

  • 优化施工组织设计减少次数,缩短建井工期

    Optimizing the Construction Organization Planning, Decreasing the Tunes of Uncovering Coal Seam, Shortening the Period of Mine Construction.

    youdao

  • 本文研究了资源有限工期最短优化问题提出了相应的分枝算法

    In this pater, the problem of limited resources and shortest time limit for a project is studied and an algorithm of branch and bound method for this problem is proposed.

    youdao

  • 网络计划工期—费用优化算法

    Duration-Cost trend-off of network plan is presented.

    youdao

  • 提供整个项目价值工程投入提出设计施工优化方案降低成本提高质量缩短工期

    Provide value engineering input throughout the project and propose changes to the design and construction to reduce cost, enhance quality and shorten the project schedule;

    youdao

  • 提出结合柔性网络计划技术进度分析优化方法,包括工期分析资源优化基础上提出了基于可视化动态仿真施工进度实时管理与控制方法;

    The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;

    youdao

  • 提出结合柔性网络计划技术进度分析优化方法,包括工期分析资源优化基础上提出了基于可视化动态仿真施工进度实时管理与控制方法;

    The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定