根据米利班德四月份宣布的计划,所有的新煤电厂必须在部分工序上安装CCS。
Under Miliband's plans announced in April, all new coal plants must fit CCS to part of the operation.
部件生产部门按照收到的计划生产并把成品部件运送到下一道工序。
These part-making processes produce the parts in accordance to their schedules and transport the parts to the next process.
在传统的生产中,各种生产计划被传达到各个工序,部件生产和组装部门。
In traditional manufacturing, various production schedules are released to all processes; component making and assembly.
2008年8月开发的LEMA 6062.03项目的控制计划中,挤出工序没有过程参数的描述,硫化工序没有产品要求的描述;
No process parameter description of thin milling process and no product requirement of molding and vulcanizing process in CP for project LEMA 6062.03 developed on Aug. , 2008.
严格执行生产计划,保证均衡生产和工序间的衔接。
Strictly implement production plan to ensure the balanced production and the linkage between different working orders.
计划,纠正并优化所有的工序直至量产;
Plan, correct and optimize all steps until release of initial series production.
本文研究了计划评审技术(PERT)网络中非关键工序的敏感性问题。
This paper studies the sensitivity of non-critical process in program evaluation and review technique (PERT) network.
之后他们把新螺钉,以及一个特殊定制的、长而弯曲的钛板钉到合适的位置上去,这块钛板是赫希用一个名为“虚拟外科计划”的电脑辅助设计工序预先制作的。
This they fixed in place with fresh screws and a long, curved, custom-fitted titanium plate, which Hirsch had prefashioned through a computer-assisted design process called virtual surgical planning.
编制进度计划——分析工序顺序、工序持续时间和资源需求。
Schedule development-analyzing activity sequences, activity durations, and resource requirements to create the project schedule.
一个优秀计划员必须清楚进程、工序、合约条款、等等。
A good planning must well know the progress of works, working sequence, contract conditions, etc.
在扫数模具计划中,必须供给未加工和已加工的工序图,以及产品顶出及废料脱落方法。
Provision for loading and unloading of raw materials for all dies, as well as part ejection and scrap removal will be covered during the die design.
本文从工序时间的模糊性和概率性出发,运用云模型理论对网络计划技术进行了研究。
This paper start from the time of process of fuzzy and probability, and making the use of cloud model theory to study network planning techniques.
根据公路工程的特点,将公路工程项目进行工序分解,利用网络计划图将其连接成一个整体。
On the basis of highway project characters, this research links all working procedure of a highway project together by network planning.
在施工网络计划的优化过程中,就关键工序光面爆破进行了优化设计。
Optimization of smooth blasting procedure, the most important one for network plan, is discussed.
在云模型网络计划中,利用逆向云发生器算法来实现工序时间估计向云模型的转换。
For network planning based the cloud model, Reverse cloud generator algorithm was used to converse the estimated time to the cloud model.
引入浮动工时率的概念,提出了结合浮动工时率和网络计划工序拓扑排序的一种新的编码解码方法。
The concept of float rate was introduced. Integrating float rate with the toposorting of activities in network scheduling, a new method of coding and decoding was presented.
运用网络计划蒙特卡洛仿真(MCS),从宏观的项目层和微观的工序层分别进行进度风险分析。
Using Monte Carlo Simulation (MCS), project schedule risk analysis is implemented at both the macroscopic level of project and the microscopic level of activity.
针对航空产品工程计划中工序作业时间小样本输入条件的特征,提出了一种基于灰色系统理论的工序作业时间预测方法。
Aiming at the characteristics of small sampling in aeronautic-product project scheme, a new prediction method to acquire the time limit of working process was studied based on Grey System theory.
该组件有三个基本类:工序类、工程类及网络计划工具类。
There are three basic classes of the component: activity class, project class and arrow network tools class.
项目计划执行-行工序来实施项目计划。
Project Plan Execution— carrying out the project plan by performing the activities included therein.
在网络计划问题中,一项大的工程由许多工序合成。
进一步提出在经典的车间作业计划析取图模型中,通过加入相关弧以表示工序的相关性。
Then the mathematical description of operation relativity is given systematically from algebraic specification, Gantt chart expression and type conversion.
进一步提出在经典的车间作业计划析取图模型中,通过加入相关弧以表示工序的相关性。
Then the mathematical description of operation relativity is given systematically from algebraic specification, Gantt chart expression and type conversion.
应用推荐