• 工业工程中,生产线平衡衡量生产线工序作业时间平均化状况以及生产线生产效率指标

    In engineering, line Balancing Rate is the quota that measures the average situation of every cycle time in working procedure and the production efficiency on processing line.

    youdao

  • 并将联系态势排序对照,来判断工序作业时间联系数态势从而得出实现工序可能性

    Comparing this connection number with state sort table the grade of a working procedure's connection number is judged, then the possibility of this working procedure is got.

    youdao

  • 针对航空产品工程计划工序作业时间样本输入条件特征,提出了基于灰色系统理论工序作业时间预测方法

    Aiming at the characteristics of small sampling in aeronautic-product project scheme, a new prediction method to acquire the time limit of working process was studied based on Grey System theory.

    youdao

  • 其中复杂作业工序过程时间一般呈现为正分布或者威布尔分布,简单可靠性工序作业过程时间一般表现为指数分布。

    The time distribution of a complex process generally is a normal or Weibull distribution, and that of a simple and high reliable process is exponential distribution.

    youdao

  • 提出了当前简单作业工序过程时间分布预示着复杂作业工序的过程时间未来分布规律,指数分布方向趋近观点

    A view is put forward that the time distribution of a complex process will be close to exponential distribution in the future, and it will...

    youdao

  • 提出了当前简单作业工序过程时间分布预示着复杂作业工序的过程时间未来分布规律,指数分布方向趋近观点

    A view is put forward that the time distribution of a complex process will be close to exponential distribution in the future, and it will...

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定