准备工作分解结构。
定义并追踪项目计划与工作分解结构。
Defines and tracks project plan and work breakdown structure.
如果没有,可以利用工作分解结构和网络图等传统方式做一个出来。
If not, build one the old-fashioned way by utilizing a work-breakdown structure and network diagram.
目前,最佳生产力战胜了我们一直从事的在业务中分解传统工作分组的“大帽子”结构。
Right now, the biggest productivity wins we're seeing involve breaking down the traditional "stovepipe" structure of working groups within a business.
它包括使用活动图进行说明的工作分解结构。
It includes a Work Breakdown Structure illustrated with activity diagrams.
一个RMC发布过程提供了一个完整的生存周期模型,该模型包括了被细化的在方法内容中的工作分解结构(WBS)。
An RMC Delivery Process provides a complete lifecycle model that has been detailed by sequencing Method Content in work breakdown structures (WBS).
这些可能在一个特定项目、提议或工作分解结构元素的上下文环境中。
These may be within the context of a particular project, proposal or work breakdown structure element.
对于能力模式和交付过程的创建中的第三步,会生成一个工作分解结构(work breakdown structure,WBS)。
For the third step in the creation of the capability patterns and delivery processes, a work breakdown structure (WBS) is created.
软件设计人员可以创造并把他们的过程作为一个过程网站发布,或者作为一个工作分解结构输出到IBMRationalPortfolioManager 。
Software designers can author and publish their process as a process Web site or export it to IBM Rational Portfolio Manager as a work breakdown structure.
TomMochal提供了5点实践性的建议,下次进行工作分解结构设计时,你可以拿来参考节省时间。
Tom Mochal offers some practical advice to save you time and rework on your next work breakdown structure.
RMC还支持不同的过程表示,比如工作分解结构或工作流表示。
RMC also supports different presentations for processes, such as work breakdown structure or workflow presentations.
图5显示了过程通常被表示为工作流或分解结构。
Figure 5 shows that processes are typically expressed as workflows or breakdown structures.
一个好的管辖结构分解为工作的类型和计划来监督工作的权威。
A good governance structure decomposes both the types of work and the authority to plan and oversee work.
图17显示了一个典型的工时单视图,展示了计划好的工作分配情况、工作分解结构和每个任务分派相应的数据。
Figure 17 shows a typical Timesheet view that displays work assignments by project, the work breakdown structure and corresponding data for each task assignment.
你创建一个有用的例行程序,然后再一个,接着又一个,很快所有你所做的工作就是创建,重分解和改进测试的基础结构。
You create one useful routine, then another, then another, and pretty soon all you're doing is building and refactoring and refining the test infrastructure.
图5:在RMC中过程被表示为工作流或分解结构。
Figure 5: Processes are expressed as workflows or breakdown structures in RMC.
需求的创建来自于需要,工作状态,以及对工作分解结构(WBS)中的工作的估计。
The creation of demand comes from the requirements, statement of work, and by estimating the effort by the work breakdown structure (WBS).
可以将工作项安排为层次结构,以将较大的工作项分解为较小的单元。
Work items can be arranged into a hierarchy to decompose larger work items into smaller work units.
当你需要从草稿中拟定出日程表时,工作分解结构(WBS)是理解项目工作细节的最好方式。
A work breakdown structure (WBS) is the best way to understand the detailed work of a project when you have to build a schedule from scratch.
可以将流程视为工作流或分解结构。
允许在分解结构编辑器中建立过程,允许通过使用过程多种表示编辑器建立工作流图。
Allows creating processes with breakdown structure editors and workflow diagrams through use of multi-presentation process editors.
这个图表对我们的主要目的是对时间进对和里程碑达成一致,并且建立工作分解结构(work breakdown structure,WBS)的层次图,工作分解结构中的每一项我们都可以跟踪、估计和执行。
The main purpose of the chart was for us to agree on schedule and milestones and to set up a hierarchy of work breakdown structure (WBS) items that we could track, estimate, and execute against.
工作分解结构(WBS)用于每个项目中。
定义工作分解结构(WBS)。这是一张任务列表。如果这些任务得到执行,将会产出工作产品,而这些工作产品是形成软件所必须的。
A work breakdown structure (WBS) is defined. This is a list of tasks that, if performed, will generate all of the work products needed to build the software.
缺少一个清晰的工作分解结构。
举例来说,一个正式的工作分解结构,进度网络,挣值分析,改变控制过程等。
For example, a formal work breakdown structure, schedule network, earned value analysis, change control process and so on.
介绍了冲压工艺分解过程、排样图、模具结构、工作原理以及模具关键零部件的设计。
The decomposing process of punching, layout, die structure, work principle and design of key part of die are introduced.
你是一个新产品开发项目的项目经理,这个项目的工作分解结构有四个层次,并按顺序使用箭线图技术。
You are a project manager for a new product development project that has four levels in the work breakdown structure, and has been sequenced using the arrow diagramming technique.
工作分解结构把项目工作分成较小和更便于管理的多项工作,每下降一个层次意味着对项目工作更详尽的说明。
The WBS subdivides the project work into smaller, more manageable pieces of work, with each descending level of the WBS representing an increasingly detailed definition of the project work.
工作分解结构把项目工作分成较小和更便于管理的多项工作,每下降一个层次意味着对项目工作更详尽的说明。
The WBS subdivides the project work into smaller, more manageable pieces of work, with each descending level of the WBS representing an increasingly detailed definition of the project work.
应用推荐